Laserfiche WebLink
Due to the presence of larger stands of oak trees, tree clearing activities shall occur prior to April 15 or after <br />July 15 to minimize the potential introduction of Oak Wilt to the site and this note must be added to both the <br />Grading, Drainage, and Erosion Control Plan as well as the Tree Inventory and Protection Plan. Additionally, <br />please consult with the Certified Arborist that prepared the Tree Inventory and Protection Plan to prepare a <br />plan that identifies the precautionary steps to be taken on site to protect oak trees from Oak Wilt. <br />Density Transitioning: As proposed, the development is subject to the density transitioning standards found <br />in City Code Section 117-110. New exhibit received 6/28/17 shows reduction in pad depth to 50 ft and <br />preservation of trees in eastern three lots (staff has not had sufficient time to review new exhibit). Still needed <br />are an evaluation of trees present on Block 1, Lot 1. See landscaping and environmental resources comments. <br />Streets and Access: Seven (7) of the eight (8) lots will gain access from an extension of Lithium Street. The <br />eighth lot will retain access to TH 47, but driveway will be moved further north for safety (note the remainder <br />of the plat adjacent to TH 47 must have restricted access and is reviewed and subject to MNDOT approval). <br />Cul-de-sac length is limited to a maximum of 600 feet; the proposed length of the cul-de-sac is an additional <br />400 feet onto the existing 900 foot existing cul-de-sac. It appears that the proposed cul-de-sac meets the <br />minimum standards. <br />Sidewalks: There is an existing sidewalk that currently terminates at the edge of the temporary cul-de-sac. <br />Rather than have a sidewalk ending mid -block, Staff recommends that it be extended to the northern boundary <br />of the plat, which will also allow for future connectivity should the land to the north develop. <br />Grading and Drainage Plans. A permit from the LRRWMO will be required. See engineering comments for details. <br />Next revisions must include changes in grading in block 1 as per exhibit from 6/28/17. <br />Development Fees. Development Fees will be due with the Plat including, but not limited to, Park Dedication, <br />Trail Development, Storm water Management, Trunk Water and Trunk Sanitary Sewer. These fees are collected <br />at the time the Final Plat is recorded and at the rate in effect when the final plat is recorded. <br />Development Agreement: An executed Development Agreement will be required prior to releasing the plat <br />for recording. An engineer's estimate for public improvements will be required with the submitted final plat <br />