Laserfiche WebLink
Review File: Cole Addition <br />Preliminary Plat <br />Engineering Review <br />June 28, 2017 <br />Page 3 of 3 <br />5. Specify length of DIP. <br />6. Label proposed grade in profile. <br />7. List station for hydrants and connection to existing stubs. <br />8. Provide key to elevations listed at bottom of profile. <br />9. See City Standard detail for casting styles. <br />10. Reference City patch detail for new service installation. Bituminous must be removed and <br />replaced from curb to curb. Label the service installation plan view. <br />11. The current City details are available on the City website. <br />C4.1: <br />1. A sheet specific legend is required listing all symbols and lines on this sheet. <br />2. Sidewalk must be shown along the north side of the street. Sidewalk is 6 feet wide by 6 <br />inches thick. <br />3. Pedestrian ramps are required at Kamacite Street and the cul-de-sac. A site specific detail <br />is required for each lists elevations, grades and distances. The MNDOT 6 sheet set for <br />pedestrian ramps must be added to the set.. <br />4. Provide key to elevations listed at bottom of profile. <br />Detail Sheets: <br />1. Detail sheets must be added to the set as noted above. <br />L1.1: <br />1. A sheet specific legend is required listing all symbols and lines on this sheet. <br />2. Several trees to be removed along the north property line appear to be outside of the <br />project. <br />Stormwater Calculations <br />1. The stormwater summary indicates the infiltration basins provide the required infiltration <br />volume. Soil borings are required to determine the groundwater elevation and show that 3 <br />feet of separation is available between the bottom of the basin and the groundwater <br />elevation. <br />2. The infiltration area and the stormwater detention area are the same. The detention area <br />must be totally dry 48 hours after the 100 year event. If this cannot be achieved then the <br />infiltration and detention areas must be separated. Calculations must be provided to <br />support the statement on the summary sheet. <br />3. Tables listing the P8 results are included. The P8 input data must be added to the report. <br />