My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 08/03/2017
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2017
>
Agenda - Planning Commission - 08/03/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:28:44 AM
Creation date
12/28/2017 9:28:33 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
08/03/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review File: Greenway Terrace <br />Final Plat and Site Plan Review: <br />July 27, 2017 <br />Page 2 of 4 <br />Build to Line: 20 feet <br />Building Height: 1-4 stories <br />19 feet 10 inches <br />3 stories <br />Streets and Access. The second lift of both 146th Avenue NW and Traprock Street NW will need to be <br />constructed. A cost share of those improvements will need to be worked out between the City and the <br />Applicant. <br />Development Fees: Development Fees will be due with the Plat including, but not limited to, Park Dedication, <br />Trail Development, and Stormwater Management. These fees are collected at the time the Final Plat is recorded <br />and at the rate in effect when the plat is recorded. <br />Development Agreement: An executed Development Agreement for the site improvements will be required <br />prior to releasing the plat for recording. Staff will review the engineering estimates once submitted by the <br />Applicant. <br />Site Plan Review <br />Necessary Plan Revisions: <br />1. Elevations revised to provide a change in material over the entrance of the building. <br />2. Plans revised to show the relocation of the trash enclosure to the southern edge of the western <br />most row of parking so that it is adjacent to the principal structure. The enclosure materials will <br />be revised to match the materials of the principal structure. <br />3. The parking table indicates 3 handicap parking stalls but only 2 handicap stalls are shown. This <br />discrepancy will need to be clarified. <br />General. The purpose of this portion of the review is to assess the submitted site plan application for Greenway <br />Terrace. The associated plans were prepared by UrbanWorks Architects, BKBM, and Damon Farber <br />Associates and are dated June 1, 2017. <br />Surfacing: The Applicant is proposing a completely bituminous parking lot which is an acceptable material <br />within The COR. The current plan shows a stub being constructed along the western edge of the parking area <br />to service the second phase of the project that would include a second apartment building and associated <br />improvements. Plans also show a concrete sidewalk along the interior of the project adjacent to the parking <br />areas and structure as well as concrete sidewalks along 146th Avenue NW, Traprock Street NW, and East <br />Ramsey Parkway. <br />Building Architecture: The proposed structure is three (3) stories in height and shows a mixture of proposed <br />facade materials. Those materials include 6" white and 10" blue vinyl siding (plan set indicates "TBD" on the color <br />of the 10" siding), as well as brick and masonry stone veneer. The Design Framework requires that residential <br />uses in the COR 4 sub -district comply with the following <br />1. Location of Main Entrance: The building must have a front porch or covered balcony/patio at all main <br />entrances that face a street. The main entrance of each principal building must face the street. On <br />corner lots, the main entrance may face either of the streets or be oriented to the corner. The South <br />
The URL can be used to link to this page
Your browser does not support the video tag.