Laserfiche WebLink
Review File: Jaspar Industrial Park <br />Preliminary Plat <br />Engineering Review <br />July 28, 2017 <br />Page 2 of 3 <br />8. This project will require a stormwater permit from the Lower Rum River Watershed <br />Management Organization (LRRWMO). <br />9. A geotechnical report was provided. <br />Sheet 3 of 7: <br />1. Add a tipout curb detail. <br />Sheet 4 of 7: <br />1. Add note: "All erosion control measures must be installed and inspected by the City prior <br />to performing any work on site." <br />2. Hatch is making underlying notes unreadable. <br />3. Add Block wall to legend. <br />4. Work is shown on City property. An access agreement must be negotiated or no work can <br />be done outside of the property boundaries. <br />5. Provide ingress and egress easement for access to the Cemetery. <br />Sheet 5 of 7: <br />1. Provide access route to Cemetery. <br />2. Add note: "Do not disturb Cemetery fence." <br />3. Label slope grades. <br />4. If drainage from west lot will go into pond then an easement is required around the pond. <br />5. Grading is shown on the City lot. An access agreement is required. The swale blocks <br />access, a culvert must be installed to maintain access. <br />6. Change 14 days to 7 days. Change 24 hours to 3 hours after notification by City. <br />7. Check all notes for readability. <br />Sheet 6 of 7: <br />1. Verify water valves are working correctly. Add new valves at connections if old valves do <br />not work. <br />2. Add note "All DIP 6" and smaller shall be Class 53." <br />3. Check sewer inverts based on grades and length. <br />Sheet 6 of 7: <br />1. Turn off existing contours on this sheet. <br />Architectural Plans <br />No Comments. <br />Stormwater Summary <br />The project is providing volume control (infiltration) and rate control for all storms. The south <br />infiltration area must be reconfigured. Runoff must be directed to the area 3 feet above <br />