Laserfiche WebLink
Review File: Jaspar Industrial Park <br />Preliminary Plat <br />Engineering Review <br />July 28, 2017 <br />Page 3 of 3 <br />groundwater for infiltration. The design as shown directs all runoff to the portion of the pond in <br />contact with the groundwater which does not meet the infiltration guidelines. <br />