My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/09/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 01/09/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:43:04 PM
Creation date
1/10/2018 12:07:03 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/09/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
744
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pedestrian Facilities: <br />Pedestrian facilities exist along several of the street segments proposed to receive an <br />overlay. Staff will evaluate potential impacts to each facility during design and plan <br />preparation to determine whether any adjustments or improvements are needed. <br />4.2 Stormwater Improvements <br />No storm sewer construction or repair work is proposed. Only minor structure casting <br />adjustments are proposed. Stormwater improvements will be further evaluated during <br />preparation of plans and specifications. <br />4.3 Water Main Improvements <br />No watermain improvements are proposed with this project. <br />4.4 Sanitary Sewer Improvements <br />No sanitary sewer improvements are proposed with this project. <br />4.5 Construction Methods <br />A 1-inch deep joint mill will first be performed at the street tie-in locations for each street <br />segment. The Woodland Green neighborhood is proposed to receive a 7-foot wide edge mill <br />along both sides of the streets due to severely degraded pavement conditions. Then all existing <br />metal castings for storm sewer will be raised, including grouting of catch basins as needed, after <br />which the pavement will be swept to remove any loose debris. A coating of bituminous tack <br />material will then be applied to the existing pavement which serves as a glue to adhere the <br />bituminous overly to the existing bituminous pavement. Each street will then receive a 2-inch <br />bituminous overlay lift. <br />4.6 Private Utilities <br />Staff has not yet met with the private electric, gas, and telecommunications utility companies <br />regarding this project. Once plans and specifications are ordered, staff will meet with private <br />utility companies per the project schedule in this report to discuss the proposed improvements, <br />and to determine if modifications are feasible and/or warranted to minimize impacts to their <br />utilities. Based on preliminary reviews, staff does not anticipate any impacts to private utilities. <br />Should a utility company decide to upgrade, replace, or otherwise modify their services during <br />this project, any such upgrades, replacements, or modifications will be at the sole discretion and <br />cost of the private utility company. Such work could include burying existing overhead lines. <br />4.7 Permits <br />Permits that are anticipated to be required as part of the proposed improvements include: <br />• Anoka County Highway Department Permit Work in Right -of -Way <br />• MPCA General Stormwater Permit (NPDES) Grading and Storm Water <br />Feasibility Report <br />2018 Street Overlay Improvements <br />City of Ramsey Project No. 18-03 <br />Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.