Laserfiche WebLink
PRELIMINARY ESTIMATE — NORTHFORK OAKS <br />Item <br />No. <br />Description <br />UnitEstimated <br />Quantity <br />Unit Cost <br />Cost Extension <br />1 <br />Mobilization <br />LS <br />1 <br />$600.00 <br />$600.00 <br />2 <br />Sawing Bituminous Pavement — Full Depth <br />LF <br />60 <br />$3.00 <br />$180.00 <br />3 <br />Mill Bituminous Pavement (2" Depth — Street Tie-in) <br />SY <br />55 <br />$1.25 <br />$68.75 <br />4 <br />Bituminous Material for Tack Coat <br />GAL <br />252 <br />$2.50 <br />$630.00 <br />5 <br />Type SP Wearing Course Mixture (SPWEA340C) (2.0") <br />TON <br />396 <br />$63.00 <br />$24,948.00 <br />6 <br />Adjust Casting (Storm Sewer) <br />EA <br />2 <br />$375.00 <br />$750.00 <br />7 <br />Traffic Control <br />LS <br />1 <br />$1,000.00 <br />$1,000.00 <br />Northfork Oaks Construction Cost <br />$28,176.75 <br />5% Contingency Cost <br />$1,408.84 <br />14% Indirect Cost <br />$4,141.98 <br />Northfork Oaks Preliminary Project Cost <br />$33,727.57 <br />18-03 PRELIMINARY ESTIMATE SUMMARY <br />PROJECT AREA <br />PROJECT COST <br />TOTAL ASSESSMENT (25%) <br />WOODLAND GREEN <br />$150,826.79 <br />$37,706.70 <br />THE NORTH FORTY 2ND <br />$53,958.37 <br />$13,489.59 <br />THE NORTH FORTY 3RD <br />$157,635.32 <br />$39,408.84 <br />NORTHFORK ITASCA SHORES <br />$40,899.69 <br />$10,224.92 <br />NORTHFORK <br />$49,891.86 <br />$12,472.96 <br />NORTHFORK 2ND & 3RD <br />$98,521.18 <br />$24,630.29 <br />NORTHFORK OAKS <br />$33,727.57 <br />$8,431.89 <br />PRELIMINARY ESTIMATED TOTALS <br />$585,460.78 <br />$146,365.19 <br />Feasibility Report <br />2018 Street Overlay Improvements <br />City of Ramsey Project No. 18-03 <br />