Laserfiche WebLink
Street Improvements <br />15-STR-008 <br />U <br />• O <br />Project Name Reconstruction Streets Stanhope Terr & Riversbend <br />)bli€ <br />Total Cost $750,000 <br />00 <br />Description <br />• <br />U <br />.rJ <br />ti <br />'o <br />a) <br />ct <br />0 <br />O <br />a) <br />0 <br />0 <br />0 <br />O <br />a) <br />0 <br />0 <br />0 <br />0 <br />0 <br />Q <br />a) <br />0 <br />U <br />0 <br />C <br />O <br />cu <br />0 <br />6cu <br />0 <br />C <br />O <br />C <br />O <br />O <br />O <br />.0 <br />cd s, <br />cn O <br />N <br />cu <br />cn <br />- <br />E. to <br />Look at Possibility of Using MSA or PIR funds for portion of costs instead of bonding. <br />N <br />N <br />00 <br />N <br />cn <br />N <br />.a <br />Sao <br />N <br />N <br />00 <br />Funding Sources <br />O O O <br />O O O <br />0) O 0) <br />N O 1— <br />(O O CO <br />O O O <br />O O O <br />0) O 0) <br />cs O f� <br />(O O CO <br />