Laserfiche WebLink
Street Improvements <br />Street Improvement <br />1-Existing Obligation (High) <br />Aj <br />0 bA p <br />U U 0. <br />Q <br />15-STR-011 <br />0 <br />0 <br />U <br />d) <br />O <br />0 <br />00 <br />Project Name <br />0 <br />Total Cost $675,000 <br />Description <br />0 <br />O <br />0 <br />O <br />-O <br />0 <br />cu <br />a) <br />uction at t <br />cluding recons <br />ularly scheduled basis, <br />ce on a re <br />Each paved street within the City is scheduled to r <br />There is a total of $2.2M designated to maintain streets annually. <br />'O <br />0a) O <br />0 <br />U <br />Q. <br />N0,3 <br />0 <br />0 <br />0 <br />essed at 25% of c <br />0 <br />ass <br />cu <br />Justification <br />rgency repai <br />b1 <br />0 <br />0 <br />b1 <br />0 <br />0 <br />U <br />0 <br />iL <br />0,3 <br />a) <br />G' <br />cu <br />a) <br />co <br />0 <br />EA <br />U <br />a) <br />'O <br />rob <br />w <br />U <br />0 <br />a' <br />C <br />'O <br />O <br />'O <br />0 <br />ct <br />0 <br />bq <br />onal pavement life. These streets were selected based on Paser rating and time since last pavement maintenance treatment. <br />Overlaying streets provides add <br />Look at Possibility of Using MSA or PIR funds for portion of costs instead of bonding. <br />VD <br />N <br />N <br />CO <br />rl <br />N <br />O <br />co <br />(0 <br />s <br />H <br />a1 <br />N <br />rl <br />Funding Sources <br />O O <br />N- N <br />CO - <br />CO O <br />LO <br />