Laserfiche WebLink
Street Improvements <br />Street Improvement <br />1-Existing Obligation (High) <br />0 bA p <br />L) r. <br />o. U 0. <br />3 <br />15-STR-012 <br />Total Cost $612,200 <br />Description <br />0 <br />0 <br />O <br />a) <br />uction at t <br />cluding recons <br />ularly scheduled basis, <br />Each paved street within the City is scheduled to r <br />Brookview Estates, Meadow View, Flintwood Hills, Wood Pond Hills, Chestnut Ridge <br />2019 Projects: <br />There is a total of $2.2M designated to maintain streets annually. <br />essed at 25% of cost <br />Justification <br />g emergency repai <br />a) <br />00 <br />a) <br />a) <br />a) <br />a) <br />U <br />a) <br />4-1 <br />a) <br />a) <br />C <br />-o <br />a) <br />0 <br />cu <br />0 <br />0 <br />00 <br />Overlaying streets provides additional pavement life. These streets were selected based on Paser rating and time since last pavement maintenance treatment. <br />Look at Possibility of Using MSA or PIR funds for portion of costs instead of bonding. <br />co <br />O <br />N <br />N <br />co <br />c <br />U) <br />to L <br />p v 0 <br />N to <br />O <br />N E0 <br />> <br />0 O <br />Q <br />�d W E <br />00 <br />0 <br />H <br />H <br />N <br />Cr, <br />rl <br />00 <br />Funding Sources <br />O O <br />6) <br />0) 0) <br />O O <br />6) <br />0) 0) <br />H <br />