Laserfiche WebLink
Street Improvements <br />H <br />Project Name Reconstruction of Streets-Barthels Rum River Acres <br />Oblig <br />Total Cost $3,553,400 <br />Description <br />a) <br />0 <br />O <br />0 <br />0 <br />Reconstruction of Alpine Drive between Pu <br />Justification <br />a) <br />0 <br />a) <br />a) <br />0 <br />0 <br />O <br />a) <br />a) <br />0 <br />0 <br />U <br />0 <br />cluding recons <br />ularly scheduled basis <br />a) <br />Look at Possibility of Using MSA or PIR funds for portion of costs instead of bonding. <br />H <br />VD <br />•71- <br />00 <br />H <br />H <br />N <br />N <br />N <br />N <br />00 <br />Funding Sources <br />(n o (n <br />0) - <br />(OJ M lOJ <br />G) (OJ CO- <br />G) <br />CO CO <br />N <br />(OJ O (0) <br />(OJ LO lOJ <br />0) (n CO <br />6) 0) <br />M 6) <br />f— CO <br />a a CO O <br />N <br />E o H <br />N j d' <br />a) <br />co N co co <br />— 'Es> c CO <br />o C <br />'5-o E Ca 'a <br />a) C <br />oo = <br />co ° mu) O u_ <br />