Laserfiche WebLink
Street Improvements <br />Street Improvement <br />3-Existing Obligation (Med) <br />0 bA p <br />L) N U Q. <br />Q <br />17-STR-002 <br />U <br />•O <br />Total Cost $539,000 <br />Description <br />N <br />0 <br />0 <br />s 2nd, Northfork Oaks 3rd, S <br />0 <br />Woods 2nd, Northfor <br />0 <br />0 <br />ti <br />0 <br />O <br />O <br />O <br />a) <br />0 <br />0 <br />ti <br />a) <br />00 <br />0 <br />cu <br />00 <br />0 <br />C <br />Mill and overlay numerous existing st <br />Total Project Costs: $539,000 <br />Justification <br />a) <br />0 <br />O <br />a) <br />a) <br />0 <br />0 <br />U <br />0 <br />cluding recons <br />ularly scheduled basis <br />ce on a re <br />C <br />cu <br />0 <br />smo <br />cu <br />'� vi <br />s0 0 <br />O to <br />N ,o <br />0 'O <br />0 0 <br />a) cd <br />U a+ <br />U °0 <br />C <br />� y <br />U <br />N y <br />s0, <br />O <br />N 0 <br />cd <br />U y <br />44 >, <br />Look at Possibility of Using MSA or PIR funds for portion of costs instead of bonding. <br />N <br />N <br />00 <br />cn <br />0) <br />'C <br />Sao <br />N <br />00 <br />H <br />VD <br />N <br />00 <br />Funding Sources <br />O O O <br />LO CD 1� CDN <br />( O 0) <br />COCO Cr) <br />O O O <br />1N — CD <br />C O 0) <br />CO <br />M <br />