My WebLink
|
Help
|
About
|
Sign Out
Home
01/11/18
Ramsey
>
Economic Development Authority
>
Full Agendas
>
2010's
>
2018
>
01/11/18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2022 4:12:29 PM
Creation date
1/16/2018 3:34:00 PM
Metadata
Fields
Template:
Full Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Segment A-1: <br />o Extension of Ramsey Parkway from Center Street NW to Xenolith Street NW. <br />• Extend the existing typical section from the east (Figures 10 & 16). <br />o Extension of sanitary sewer, storm sewer and watermain. <br />• Segment A-2: <br />o Extension of Ramsey Parkway from Xenolith Street NW to Zeolite Street NW. <br />• Extend the existing typical section from the east (Figures 11 & 16). <br />o Extension of sanitary sewer, storm sewer and watermain. <br />• Reroute existing 15-inch sanitary sewer to new alignment. <br />• Segment B: <br />o Extension of Center Street NW to Ramsey Parkway. <br />• Extend the existing typical section from the south (Figures 12 & 16). <br />o Extension of storm sewer as needed for roadway drainage. <br />• Segments Cl and C2: <br />o Construction of Xenolith Street NW from Sunwood Drive to Ramsey Parkway. <br />• 36-foot roadway with two 6-foot sidewalks on either side (Figures 13 & 17). <br />o Extension of sanitary sewer, storm sewer and watermain. <br />• Segments D1, D2, D3 and D4: <br />o Construction of sidewalk and plantings along the north side of Sunwood Drive. <br />• Extend the existing boulevard layout used east of Sapphire Street NW (Figures 14 & 17). <br />o Extension of irrigation for planting areas. <br />• Segment E: <br />o Construction of Yolite Street NW from Sunwood Drive to Ramsey Parkway. <br />• 36-foot roadway with two 6-foot sidewalks on either side (Figures 15 & 17) <br />o Extension of watermain. <br />o Extension of storm sewer for regional pond outlet. <br />Estimated project costs for each segment were developed to allow for the City to plan for the sequenced <br />implementation of the improvements and are summarized later in this report. <br />Jurisdictional Authority/Approvals/Permits <br />As the project moves from the planning stages to design and construction, permits will be required from <br />various agencies. Understanding and planning for requirements associated with obtaining permits and <br />approvals at this time will be critical to the ultimate success of the process. The following agencies will <br />be permitting entities for considered improvements: <br />• Minnesota Department of Transportation State Aid: Sunwood Drive NW is a State Aid route, <br />• Minnesota Pollution Control Agency: NPDES Storm Water Permit, <br />• Minnesota Pollution Control Agency: Sanitary Sewer Extension Permit, <br />• Minnesota Department of Health (MDH): Watermain Extension, <br />• Department of Natural Resources (DNR): Dewatering, <br />• Lower Rum River Watershed Management Organization: Storm Water. <br />Prepared by: Bolton & Menk, Inc. GENERAL DISCUSSION <br />Center Street Area Analysis' R16.114929 Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.