My WebLink
|
Help
|
About
|
Sign Out
Home
01/11/18
Ramsey
>
Economic Development Authority
>
Full Agendas
>
2010's
>
2018
>
01/11/18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2022 4:12:29 PM
Creation date
1/16/2018 3:34:00 PM
Metadata
Fields
Template:
Full Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recent Improvements <br />Improvements to the area were completed in 2004, 2005 & 2014. The street and utility improvements <br />completed at that time included: <br />• 2004: Construction of a 30-inch sanitary sewer trunk main and the installation of a 12-inch <br />watermain along Sunwood Drive NW. <br />• 2005: Extension of 18-inch sanitary sewer along the anticipated West Ramsey Parkway <br />alignment from Zeolite Street to Yolite Street NW, then along Yolite Street to Sunwood <br />Drive. <br />• 2014: Extension of 12-inch watermain along Center Street from Sunwood Drive to Ramsey <br />Parkway. A 12-inch sanitary sewer main was also installed along Center Street from <br />Sunwood Drive to 145th Avenue NW. <br />All of the improvements completed at the time were consistent with the City's Sanitary Sewer and Water <br />System Comprehensive Plans. <br />V. UNDERSTANDING PREVIOUS IMPROVEMENTS <br />Significant planning was completed prior to completion of the improvements constructed in 2004, 2005, <br />and 2014. Understanding the thoughts behind previous improvements can help avoid omissions when <br />considering future improvements. <br />Street and Trail Improvements <br />Sunwood Drive NW <br />The improvements completed in 2004 provided a fully developed concrete roadway adjacent to the study <br />area. The boulevard was designed to allow for future widening and expansion as development and other <br />improvements occur. <br />Center Street NW <br />Improvements to Center Street NW were completed in 2014 and included construction of a 36-foot wide <br />bituminous street with a 10 foot concrete sidewalk, angled parking along the west side, and parallel <br />parking stalls along the east side of the street. <br />The extension of the full Center Street typical section was completed to 100-feet north of 145th Avenue <br />NW. The remaining roadway was then constructed as a temporary street section with bituminous curb and <br />a bituminous trail for a distance of approximately 220-feet to Ramsey Parkway. <br />Zeolite Street NW <br />Zeolite Street was constructed as a temporary rural section with bituminous surface in 2005 from <br />Sunwood Drive to Bunker Lake Boulevard. <br />Bituminous Trails <br />A 10-foot wide bituminous trail was constructed in the wide median of Ramsey Parkway east of Center <br />Street. A continuation of the trail was also constructed along the west side of Center Street to allow for a <br />connection to the 10-foot concrete walk near 145th Avenue NW. <br />Prepared by: Bolton & Menk, Inc. UNDERSTANDING PREVIOUS IMPROVEMENTS <br />Center Street Area Analysis' R16.114929 Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.