Laserfiche WebLink
Mr. Dave Hartley, city Admin. <br />Page 2 <br />November 23, 1988 <br /> <br />The total cost to make changes was $650.00. We agree with the <br />architect that the contractor was at least partially at fault for <br />not'submitting the required shop drawings. We also believe that <br />had the panel been more clearly described as a fabricated panel <br />that the bid likely would have been higher to cover the cost. We, <br />therefore, are recommending that a change order be approved for <br />$325.00 for half the costs of the required change. <br /> <br />Sincerely, <br /> <br />HAKANSON ANDERSON ASSOCIATES, INC. <br /> <br />cc: <br /> <br />Jim Hiltz, Architect <br />A1 Blazevich, Cottonwood Construction <br /> <br />File: RA7:ll-!i <br /> <br /> <br />