Laserfiche WebLink
The maximum front yard setback in the TC-2 district is 0-15 feet. The applicants received a <br />variance to the front yard setback from the Board of Adjustment. <br /> <br />The site grading was reviewed as part 'of the approval process for the previous 3 buildings. <br />However, the-restaurant building has been modified to include a drive-up window. This required <br />revisions to the grading plans which were reviewed by the Engineering Department. <br /> <br />A total of 445 parking spaces are required for 100,000 square feet of retail and 9,000 square feet <br />of restaurant. The site plan identifies 489 parking spaces. December 7 revisions to the design of <br />the drive-thru lane necessitated reducing the number of parking spaces to 488 and additional <br />modifications to the Grading and Drainage Plan. <br /> <br />The Landscape Plan has been reviewed and meets or exceeds the City's requirements. Staff has <br />made some suggestions for diversity in species and trees that are more tolerant of de-icing salt. <br /> <br />The site plan for the Pond Building generally conforms to the Town Center Development <br />Guidelines. There are no public parks identified for this sub-district and small group sitting areas <br />and a mixture of plantings and pavement are encouraged.' The west side of the building includes <br />an outdoor dining area that overlooks the landscaped pond. The selected architectural materials <br />include brick, EIFS, split face CMU integrally treated with color, and metal accents. Staff is <br />requesting a sample of the corrugated metal panel material noted on the building elevations. The <br />guidelines recommend that 35% of ground level street front facades be glass openings. The <br />building does not front on a street but the amount of glazing on the north wall facing the parking <br />lot [s 18%. The reduction in glazing is acceptable as restaurants are not the typical window <br />shopping experience the City is striving for with the retail buildings. The building material <br />calculations indicate that 44% of the non-glazed area is brick and/or a comparable material. <br /> <br />Recommendation: <br /> <br />City Staff recommends approval of the final site plan. <br /> <br />Commission Action: <br /> <br />Motion by Commissioner and seconded by Commissioner to <br />approve the final site plan for the' Pond Building in Ramsey Town Center 3r~ Addition contingent <br />upon compliance with City Staff Review Letter dated December 29, 2004. <br /> <br />Review Checklist: <br /> <br />Community Development Director <br />Civil Engineer [I <br /> <br />PC: 01/06/05 <br /> <br />Copies To: <br /> <br />City Attorney <br /> <br />11 <br /> <br /> <br />