My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/04/2005 - Special
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 01/04/2005 - Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:37:28 PM
Creation date
1/3/2005 10:19:34 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Title
Special
Document Date
01/04/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
intersections of Bunker Lake Boulevard (C.R. 116) with Armstrong Boulevard (C.S.A.H. 83) and <br />Ramsey Boulevard (C.R. 56), along with all county highways and intersections between Bunker <br />Lake Boulevard and Highway 10, inclusive of Armstrong Boulevard and Ramsey Boulevard. <br />Adequate storage and drainage systems wilt be .provided by the City for the ultimate section of <br />each of those roadways listed above in their final configuration as anticipated by this Agreement. <br /> <br />COSTS <br />A. The contract cost of the work, or if the work is not contracted the cost of all labor, materials, <br /> normal engineering costs, equipment rental required to do the work and right-of-way acquisition <br /> costs shall constitute the actual "construction costs" and shall be so referred to herein. Total <br /> Construction Costs shall include construction costs and administrative costs such as bonding <br /> expenses, legal expenses and engineering fees, provided however, that said adm/nistrative costs <br /> shall not exceed 26 percent (26%) of the construction costs. "Estimated total construction costs" <br /> are good faith projections of costs which will be incurred for the projects. <br />B. Total estimated construction cost of the Improvements described in schedules A, B and C is <br /> $13,050,372.08. These figures are based on the City estimates included in the "Summary of - <br /> Estimated Project Costs for the Ramsey Town Center Improvements" incorporated herein by <br /> reference. The project costs shall be paid for by special assessments, City funds, State funds, <br /> Federal funds and County contributions as hereinafter provided. The projects for which the costs <br /> are to be shared by the County and the City, the estimated total cost of each project, and the <br /> County participation in each project is listed in schedules "A", "B", and "C" on Pages 9 and 10 of <br /> this ,~greement. <br /> <br />The estimated costs for the signal projects are $2,801,250 of which $1,012,500 is on T.H. 10. <br />The remaining $1,788,750 in estimated signal costs are on County highways. Since only two of <br />the signal systems on the County highway system are warranted, the County will not participate <br />in thei-v construction of unwarranted signals. The county will participate in construction of and <br />will provide ongoing maintenance for the signal systems 'at Armstrong Boulevard (CSAH 83) at <br />Bunker Lake Boulevard (C.R. 116) and Ramsey Boulevard (CSA/-UCR 57) at Bunker Lake <br />Boulevard (CSAH 116), in accordance with the county cost sharing policy. <br /> <br />(1) The City shall submit plans for each signal system, including EVP, to the County for <br /> review and approval sixty (60) days prior to the advertising for bids. The City shall pay <br /> to the County a plan review fee of $l,000 for each signal plan submitted. <br /> <br />7 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.