Laserfiche WebLink
(2) <br /> <br />(3) <br /> <br />(4) <br /> <br />(5) <br /> <br />(6) <br /> <br />At a rate of six percent (6%) of the actual construction costs, the County shall provide <br />construction observation for the construction of the signal system. The County shall <br />have final authority to accept all roadway and signal work done within the county right of <br />way. The estimated cost to the City for construction observation is $107,325. <br /> <br />The City shall be responsible for all remaining construction and engineer/ng costs. <br /> <br />The cost ISarticipation is summarized below: <br /> <br />Anoka County: <br /> <br />City of Ramsey, Signal Construction Inspection: <br /> <br />City ofRamsey: <br /> <br />$0 <br /> <br />$107,325 <br /> <br />ALL REMAINING COSTS <br /> <br />The total cost to the City for the signal inspection is estimated at $107,325. <br />Upon award of the contract for each signal, the City shall pay to the County, upon written <br />demand by the County, ninety five percent (93%) of its portion of the cost of inspection <br />of the signal system. The city's share of the cost of the project shall include only <br />construction engineering expense and does not include administrative expenses incurred <br />by the County. <br /> <br /> <br />