Laserfiche WebLink
Phase I! (2006) <br /> <br />(1) Armstrong Boulevard is recOnstructed from T.H. 10 to 1,000 feet north of Bunker Lake <br /> Boulevard to a four lane divided roadway. This project includes signal modifications at <br /> T.H. 10 and railroad crossing upgrades.(signal and surface). <br /> <br />(2) Full traffic actuated signal systems would be installed at the intersections of Bunker Lake <br /> Boulevard and Armstrong Boulevard, and at Armstrong Boulevard and Sunwood Drive. <br /> All signals on Bunker Lake Boulevard shall be interconnected, with an interconnect <br /> system compatible with other County interconnects. <br /> <br />Co <br /> <br />Phase III (2007) <br /> <br />(1) Bunker Lake Boulevard is reconstructed to a four lane divided roadway from Armstrong <br /> Boulevard to 1,000 feet east of Ramsey Boulevard. <br /> <br />(2) Full traffic actuated signal systems would be installed at the intersection of Bunker Lake <br /> Boulevard and Town Center Drive, Bunker Lake Boulevard at Sunfish Lake Boulevard. <br /> All signals on Bunker L~tke Boulevard shall be interconnected with an interconnect <br /> system compatible with other County interconnects. <br /> <br />(3) The County will consider the addition of a full traffic actuated signal system at the <br /> intersection of Bunker Lake Boulevard and Sunwood Drive following receipt of <br /> additional traffic information to justify said signal system. <br /> <br /> The remaining City streets south of Bunker Lake Boulevard would be constructed. Town <br /> Center Drive north of Bunker Lake Boulevard will be constructed. The City will insure <br /> that only six full accesses will connect to Bunker Lake Boulevard between Armstrong <br /> Boulevard and Ramsey Boulevard, with a four-legged intersection counting as two <br /> accesses. This provision is in agreement with the original Joint Powers Agreement <br /> between the City and'the County at the time the roadway was constructed. <br /> <br /> Any modification of the signals existing on the project as a result of prior construction. <br /> <br />($ 4) <br /> <br />(s) <br /> <br />Phase IV (2007) <br /> <br /> Sunfish Lake Boulevard is reconstructed to a four lane divided roadway from T.H. 10 to <br /> 1000 feet north of the BNSF railroad. This project includes a signal improvement at T.H. <br /> 10 and a railroad crosSing upgrade to the crossing surface and signal. The County will be <br /> the lead agency on this project. <br /> <br />5 <br /> <br /> <br />