My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 01/04/2018
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2018
>
Agenda - Planning Commission - 01/04/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:29:58 AM
Creation date
1/25/2018 9:11:03 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
01/04/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review File: Affinity at Ramsey <br />Sketch Plan Application <br />Engineering Review <br />December 21, 2017 <br />Page 3 of 4 <br />All valves become the property of the City after connection to the City system. Contractors are <br />not authorized to operate valves and hydrants after they are connected to the City system <br />All watermain 8" and larger shall be Class 52, all watermain 6" and smaller shall be Class 53. <br />A drainage and utility easement is required over all waterlines leading to hydrants. <br />C5.0 <br />Use City details for all work in Right of Way. Details are available on the City Website.. <br />C5.1 <br />Use City details for all work in Right of Way. Details are available on the City Website.. <br />C5.2 <br />Use City details for all work in Right of Way. Details are available on the City Website.. <br />C5.3 <br />A custom detail is required for each pedestrian ramp in the right of way. <br />Prelim Plat 2 of 2 <br />Topographic data must be shown to 100 feet beyond the plat boundaries per City Code. <br />SW1.0 <br />This project will require a grading permit from the Lower Rum River Watershed Management <br />Organization. <br />Furnish a copy of the NPDES permit to the City. <br />Silt Fence must be inspected and approved prior to any work on site. Add a table listing the <br />proposed erosion control BMPs and estimated quantities to the plan set. <br />SW1.2 <br />Sediment Bio Rolls must be installed as noted on the detail. The City will order replacement with <br />silt fence if the installation is not per the detail, i.e., subgrade not scooped out, inadequate stake <br />spacing or movement by construction equipment. <br />SW1.3 <br />Email a copy of the inspection report to the City after every weekly or post rainfall inspection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.