My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 01/04/2018
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2018
>
Agenda - Planning Commission - 01/04/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:29:58 AM
Creation date
1/25/2018 9:11:03 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
01/04/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review File: Affinity at Ramsey <br />Sketch Plan Application <br />Engineering Review <br />December 21, 2017 <br />Page 4 of 4 <br />Submit a full set of inspection reports prior to receiving the Certificate of Occupancy. <br />Change 14 to 7 in all locations. This site is within 1 mile of the Mississippi River which requires <br />stabilization within 7 days. <br />The contractor shall have a pickup type sweeper on site or available within 3 hours after <br />notification from the City that sweeping is required. <br />The City must approve the Notice of Termination (NOT) prior to submittal to the MPCA. <br />The Training information for the SWPPP designer is shown on the plans. Contractor information <br />must be provided at the pre -construction meeting. <br />External Washing of trucks and construction vehicles will not be permitted on site. The site is in <br />the Drinking Water Protection Area for the Municipal Water Supply. <br />Vehicle fueling shall take place inside an impermeable containment area. <br />This site is in the Drinking Water Source Management Area and infiltration is not permitted. The <br />City is developing an infiltration mitigation area and the developer will make a financial <br />contribution to the Infiltration mitigation fund. <br />SW1.4 <br />Runoff from this site flows to the Mississippi River. <br />Fill in the appropriate information from the MPCA documents. <br />Change box to yes. Dewatering will be required for installation of utilities. <br />The Mississippi River is a special water. Change this box to yes. <br />The site is served by a regional stormwater treatment system. A regional infiltration system will <br />be in place when construction is finished. Revise this section. Revise the appropriate information <br />on SW1.5 also regarding permanent stormwater facilities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.