My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 02/01/2018
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2018
>
Agenda - Planning Commission - 02/01/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:30:11 AM
Creation date
2/5/2018 12:08:51 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
02/01/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review File: Rum River Meadows <br />Preliminary Plat Plan Review <br />Engineering Review <br />January 25, 2017 <br />Page 3 of 3 <br />outlets in the proposed model. The drainage areas must include offsite areas that drain to the site. <br />There are existing catch basins in Tiger Street south of Armstrong Boulevard. These must be <br />added to the existing conditions sheet along with the associated pipes and any culverts under <br />Armstrong Boulevard or Tiger Street north of Armstrong Boulevard. <br />Remove all proposed grading information from the existing conditions map. The proposed lot <br />lines can remain to provide continuity between the existing and proposed maps. <br />Proposed conditions <br />Revise model to reflect the drainage areas noted on the existing model. Add labels to drainage <br />areas on map corresponding to Hydrocad model subcatchments and ponds. Add the area east of <br />Tiger Street to the model. The drainage areas must include all land that drains to the site. Identify <br />the outlet for the 21" storm pipe. <br />Expand the summary - <br />Add calculations for sizing of infiltration basins. If infiltration basin also serves as stormwater <br />ponding for the 100 year storm or back to back 100 year storm, the pond must infiltrate the largest <br />storm in 48 hours. <br />Provide Geotechnical data to support assumed infiltration rate. Add a table showing the existing <br />and proposed runoff rates for the 2, 10 and 100 year storms for existing and proposed conditions <br />arranged by pond number. <br />Submit the Lower Rum River Watershed Management Organization (LRRWMO) application to <br />the City for review. The City will then forward the application to the LRRWMO after review. <br />
The URL can be used to link to this page
Your browser does not support the video tag.