My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/12/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 02/12/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:43:50 PM
Creation date
2/26/2018 1:41:25 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/12/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
691
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM NO. 1 <br />IP 18-08 TROTT BROOK BOARDWALK <br />CITY OF RAMSEY <br />Page 2 of 5 <br />• Ownership and Copies of Documents, and Security Thereof: All Specifications, Plans <br />and copies thereof furnished by the Owner, shall remain the Owner's property. They shall <br />not be used on another project, nor be shared or otherwise transmitted to others. <br />• Patent Fees and Royalties: The Contractor will pay all license fees and royalties and <br />assume all costs incidental to the use of any invention, design, process or device which is <br />the subject of patent rights or copyrights held by others. The Contractor will indemnify <br />and hold harmless the Owner and anyone directly or indirectly employed by the Owner <br />from and against all claims, damages, losses and expenses (including attorney's fees) <br />arising out of any infringement of such rights during or after completion of the Work, and <br />shall defend all such claims in connection with any alleged infringement of such rights. <br />• Errors, Omissions, Etc: Should it appear that the Work here intended to be done or any <br />of the materials or matters relative thereto are not sufficiently detailed or explained on the <br />Plans or in the Specifications, or should any error, discrepancy or inconsistency appear <br />between any of the Plans and the Specifications, the Owner shall furnish additional <br />drawings, details or explanations and shall have power to interpret, correct, adjust and <br />explain all errors, omissions, discrepancies, doubts and misunderstandings between such <br />Plans and Specifications, or between several drawings and Specifications, or between <br />several drawings, and the decision of the Owner therein shall be final and conclusive. <br />• Contractor's Supervision, Superintendence and Safety and Protection: The Contractor <br />will supervise and direct the Work efficiently and with skill and attention. The Contractor <br />will be solely responsible for the means, methods, techniques, sequences and procedures <br />of construction. Before undertaking the Work the Contractor will carefully study and <br />compare the Contract Documents and check and verify all figures shown thereon and all <br />field measurements. The Contractor will at once report in writing to the Owner any <br />conflict, error or discrepancy which he/she may discover. The Contractor will be <br />responsible to see that the finished Work complies accurately with the Contract <br />Documents. <br />The Owner will not be responsible for the acts or omissions of the Contractor, or any <br />Subcontractors, or any agents or employees or any other persons performing any of the <br />Work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.