existing underlying aggregate base. This reclaim material would then be spread over the reshaped and compacted <br />subgrade between the curb and gutter, and then the top 3'/2 inches of reclaim material would be removed and hauled <br />off site. Then 3'/2 inches of new bituminous pavement would be installed over the remaining compacted reclaim <br />material, resulting in a 7-ton pavement design, which is standard for residential streets. <br />The existing storm sewer system consists of four concrete catch basins located at a low point on Xkimo Street, <br />which drains stormwater runoff from the street into the Rum River via concrete storm sewer pipes. <br />The existing storm sewer system is in good condition and generally meets City design standards. The only storm <br />sewer work proposed is resetting the castings after replacing adjusting rings and re -grouting the insides of the catch <br />basins. <br />Municipal sanitary sewer and water utilities exist under each street segment. The attached plans do not propose <br />improvements to these utilities, except for casting adjustments. These utilities are scheduled to be tested to verify <br />that they are in good operating condition and should not require repairs during the serviceable life of the <br />improvements (60 years). If the tests reveal that repairs are necessary, this work would be completed separately <br />before any work on this project commences. <br />Proposed project schedule: <br />February 12 — Approve Plans and Specifications / Authorize Ads for Bids <br />February 16 & 23 — Publish Ads for Bids (Anoka Union Herald, Finance & Commerce) <br />March 15 — Public bid opening <br />March 27 — Accept Bids / Award Contract <br />Late May / early June — Begin construction <br />August 31 — Substantial completion (open to traffic) <br />October 9 — Assessment Hearing <br />Notification: <br />Public notifications were not required in advance of this case. <br />Upon Council authorization to advertise for bids, advertisements will be published in the Anoka Union Herald and <br />in Finance & Commerce on February 16th and 23rd. <br />Observations/Alternatives: <br />Observations: <br />The proposed improvements should have a serviceable life of 60 years, assuming that proactive maintenance <br />operations are performed regularly during the life of the improvements. However, since a majority of the existing <br />concrete curb and gutter is not proposed to be replaced, this curb and gutter will be monitored over time and if it <br />needs to be replaced before the improvements proposed with this project reach the end of their serviceable life, <br />Staff will re-evaluate the pavement condition at that time. <br />Some properties may have private irrigation systems. Impacts to these systems may occur because of the proposed <br />improvements. Staff will notify property owners in writing of the pending construction as far in advance of <br />construction as possible to allow them time to move their irrigation system components away from construction <br />activities. After the project is complete, property owners may replace irrigation systems in their previous locations <br />if desired. As previously discussed, all costs to relocate private irrigation system components will be the <br />responsibility of the property owners. However, if private irrigation systems are damaged due to negligence on the <br />part of the City's contractor, the contractor will be responsible to repair the damage. <br />Alternatives: <br />Alternative #1 — Motion to adopt Resolution #18-034 approving plans and specifications and authorizing <br />advertisements for bids for River's Bend Street Reconstructions, Improvement Project #17-02. <br />Alternative #2 — Motion to deny adoption of Resolution #18-034 at this time. <br />