My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/12/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 02/12/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:43:50 PM
Creation date
2/26/2018 1:41:25 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/12/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
691
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
compacted subgrade between the concrete curb and gutter, and then the top 3'/2 inches of reclaim material would be <br />removed and hauled off site. Then 3'/2 inches of new bituminous pavement would be installed over the remaining <br />compacted reclaim material, resulting in a 7-ton pavement design, which is standard for residential streets. <br />The existing storm sewer system generally consists of concrete catch basins and pipes that drain runoff from the <br />streets to adjacent low-lying areas. Two catch basins are located along 154th Lane and drain runoff from the street <br />to a low-lying area encumbered by a drainage and utility easement over the northerly 75 feet of 4851 154th Lane. <br />Three catch basins are located near the intersection of Ute Street and 154th Lane. Any storm water runoff that is not <br />collected in these five catch basins drains to the existing storm sewer systems in Alpine Drive and Roanoke Street. <br />The existing storm sewer system is in good condition and generally meets City design standards. The only storm <br />sewer work proposed is resetting the castings after replacing adjusting rings and re -grouting the insides of the catch <br />basins. <br />Municipal sanitary sewer and water utilities do not exist in Stanhope Terrace, and the attached plans do not propose <br />to install such utilities. <br />Proposed project schedule: <br />February 12 — Approve Plans and Specifications / Authorize Ads for Bids <br />February 16 & 23 — Publish Ads for Bids (Anoka Union Herald, Finance & Commerce) <br />March 15 — Public bid opening <br />March 27 — Accept Bids / Award Contract <br />Late May / early June — Begin construction <br />August 31 — Substantial completion (open to traffic) <br />October 9 — Assessment Hearing <br />Notification: <br />Public notifications were not required in advance of this case. <br />Upon Council authorization to advertise for bids, advertisements will be published in the Anoka Union Herald and <br />in Finance & Commerce on February 16th and 23rd. <br />Observations/Alternatives: <br />Observations: <br />The proposed improvements should have a serviceable life of 60 years, assuming that proactive maintenance <br />operations are performed regularly during the life of the improvements. <br />Some properties may have private irrigation systems. Impacts to these systems may occur because of the proposed <br />improvements. Staff will notify property owners in writing of the pending construction as far in advance of <br />construction as possible to allow them time to move their irrigation system components away from construction <br />activities. After the project is complete, property owners may replace irrigation systems in their previous locations <br />if desired. As previously discussed, all costs to relocate private irrigation system components will be the <br />responsibility of the property owners. However, if private irrigation systems are damaged due to negligence on the <br />part of the City's contractor, the contractor will be responsible to repair the damage. <br />As previously discussed, while preparing the Feasibility Report Staff observed that the Ute Street cul-de-sac is not <br />fully located within existing right-of-way, and that no public easements exist over the areas not located within City <br />right-of-way. Staff has therefore mailed letters to the two impacted property owners informing them of this issue <br />and asking to meet with them to discuss the potential to obtain roadway easements over the outside edges of this <br />cul-de-sac. Staff will continue to work with the property owners to obtain the necessary roadway easements to <br />allow the City to reconstruct and maintain the cul-de-sac in perpetuity. If the necessary roadway easements cannot <br />be secured before construction begins, Staff will need to consider an alternate plan. <br />Alternatives: <br />
The URL can be used to link to this page
Your browser does not support the video tag.