Laserfiche WebLink
Alternative #1 — Motion to adopt Resolution #18-035 approving plans and specifications and authorizing <br />advertisements for bids for Stanhope Terrace Street Reconstructions, Improvement Project #18-00. <br />Alternative #2 — Motion to deny adoption of Resolution #18-035 at this time. <br />Funding Source: <br />The engineer's opinion of probable project costs for the proposed improvements based on final plans and <br />specifications is $447,453.09. This cost includes 23% indirect costs for administrative, engineering, finance and <br />legal costs. By comparison, the Feasibility Report estimated project costs at $430,934.81. <br />The improvements are proposed to be funded using a combination of Street Reconstruction and Overlay Program <br />bond funds ($330,054.82), Stormwater Utility Funds ($5,535), and special assessments to benefitting properties <br />($111,863.27). <br />Sixteen (16) residential parcels use these streets to access their properties and will therefore receive special benefit <br />from the improvements. Staff proposes to assess up to 25-percent of eligible project costs equally across these 16 <br />parcels using the "per lot" assessment method. This results in proposed assessments of $6,991.45 per parcel per the <br />current cost estimate. Last November, assessments were preliminarily adopted in the amount of $6,733.36 per <br />parcel. <br />Final assessment amounts will be proposed based on actual construction costs and the findings of the special benefit <br />consultation report. Staff will request Council authorization to order a special benefit consultation report for this <br />project in accordance with the City's Special Assessments Policy at the time Council awards a construction <br />contract. The purpose of this report is to help verify that assessments will not exceed the benefit to assessed parcels <br />due to the improvements. <br />Staff proposes to let this project for bids at the same time as the River's Bend Street Reconstructions project with <br />the intent of realizing cost savings due to economies of scale. Due to their close proximity, contractors will likely <br />bid on both projects, allowing for lower unit bid prices due to increased quantities. <br />Recommendation: <br />Staff recommends Alternative # 1. This will allow the project to be constructed as part of the 2018 Street <br />Maintenance Program, and will allow for the use of special assessments to pay for up to 25% of eligible project <br />costs per the applicable provisions of Chapter 8 of the City Charter, the City's Special Assessments Policy, and <br />Minnesota Statute Chapter 429. <br />Action: <br />Motion to adopt Resolution #18-035 approving plans and specifications and authorizing advertisements for bids for <br />Stanhope Terrace Street Reconstructions, Improvement Project #18-00. <br />Resolution 18-035 <br />Plans <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Kurt Ulrich Kurt Ulrich 02/08/2018 03:11 PM <br />Form Started By: Bruce Westby Started On: 02/02/2018 02:10 PM <br />Final Approval Date: 02/08/2018 <br />