The trail then follows Center Street through much of the COR, connecting to the transit station on the
<br />north side of TH 10.
<br />Timing of Improvements
<br />While the improvements discussed and depicted in the figures will be required to support the area, timing
<br />of the improvements will most likely be dependent upon each proposed development.
<br />As individual developments are considered, the public infrastructure will need to be reviewed and
<br />determinations made as to its adequacy to serve the properties. As upgrades, extensions and
<br />improvements are determined to be necessary, funding strategies will need to be developed which may
<br />include full or partial assessments to benefitting properties.
<br />VII. COST CONSIDERATIONS
<br />Costs estimates were developed for each improvement type. These estimates are based on past bid pricing
<br />and similar projects completed previously. The segments are depicted on Figure 2 in Appendix B. All
<br />costs presented in the following pages are 2018 costs.
<br />Improvement Segment A-1 Segment A-2 Segment B Segment C-1
<br />Roadway
<br />$
<br />361,000
<br />$
<br />713,000
<br />$
<br />150,000
<br />$
<br />171,000
<br />Trails/Sidewalks
<br />$
<br />52,000
<br />$
<br />90,000
<br />$
<br />35,000
<br />$
<br />75,000
<br />Street Lighting
<br />$
<br />22,000
<br />$
<br />43,000
<br />$
<br />13,000
<br />$
<br />17,000
<br />Storm Sewer
<br />$
<br />118,000
<br />$
<br />234,000
<br />$
<br />35,000
<br />$
<br />43,000
<br />Trunk Storm Sewer
<br />$
<br />43,000
<br />$
<br />0
<br />$
<br />0
<br />$
<br />0
<br />Watermain
<br />$
<br />129,000
<br />$
<br />226,000
<br />$
<br />57,000
<br />$
<br />98,000
<br />Sanitary Sewer
<br />$
<br />78,000
<br />$
<br />47,000
<br />$
<br />0
<br />$
<br />77,000
<br />Trunk San Sewer
<br />$
<br />0
<br />$
<br />172,000
<br />$
<br />0
<br />$
<br />0
<br />Total Costs
<br />$
<br />803,000
<br />$ 1,525,000
<br />$
<br />290,000
<br />$
<br />481,000
<br />Improvement Segment C-2 Segment E
<br />Roadway
<br />$
<br />67,000
<br />$
<br />223,000
<br />Trails/Sidewalks
<br />$
<br />30,000
<br />$
<br />98,000
<br />Street Lighting
<br />$
<br />7,000
<br />$
<br />22,000
<br />Storm Sewer
<br />$
<br />17,000
<br />$
<br />119,000
<br />Trunk Storm Sewer
<br />$
<br />0
<br />$
<br />0
<br />Watermain
<br />$
<br />38,000
<br />$
<br />127,000
<br />Sanitary Sewer
<br />$
<br />31,000
<br />$
<br />27,000
<br />Trunk San Sewer
<br />$
<br />0
<br />$
<br />0
<br />Total Costs
<br />$
<br />190,000
<br />$
<br />616,000
<br />Prepared by: Bolton & Menk, Inc. COST ALLOCATION ALTERNATIVES
<br />Center Street Area Analysis I R16.114929 Page 9