Laserfiche WebLink
The trail then follows Center Street through much of the COR, connecting to the transit station on the <br />north side of TH 10. <br />Timing of Improvements <br />While the improvements discussed and depicted in the figures will be required to support the area, timing <br />of the improvements will most likely be dependent upon each proposed development. <br />As individual developments are considered, the public infrastructure will need to be reviewed and <br />determinations made as to its adequacy to serve the properties. As upgrades, extensions and <br />improvements are determined to be necessary, funding strategies will need to be developed which may <br />include full or partial assessments to benefitting properties. <br />VII. COST CONSIDERATIONS <br />Costs estimates were developed for each improvement type. These estimates are based on past bid pricing <br />and similar projects completed previously. The segments are depicted on Figure 2 in Appendix B. All <br />costs presented in the following pages are 2018 costs. <br />Improvement Segment A-1 Segment A-2 Segment B Segment C-1 <br />Roadway <br />$ <br />361,000 <br />$ <br />713,000 <br />$ <br />150,000 <br />$ <br />171,000 <br />Trails/Sidewalks <br />$ <br />52,000 <br />$ <br />90,000 <br />$ <br />35,000 <br />$ <br />75,000 <br />Street Lighting <br />$ <br />22,000 <br />$ <br />43,000 <br />$ <br />13,000 <br />$ <br />17,000 <br />Storm Sewer <br />$ <br />118,000 <br />$ <br />234,000 <br />$ <br />35,000 <br />$ <br />43,000 <br />Trunk Storm Sewer <br />$ <br />43,000 <br />$ <br />0 <br />$ <br />0 <br />$ <br />0 <br />Watermain <br />$ <br />129,000 <br />$ <br />226,000 <br />$ <br />57,000 <br />$ <br />98,000 <br />Sanitary Sewer <br />$ <br />78,000 <br />$ <br />47,000 <br />$ <br />0 <br />$ <br />77,000 <br />Trunk San Sewer <br />$ <br />0 <br />$ <br />172,000 <br />$ <br />0 <br />$ <br />0 <br />Total Costs <br />$ <br />803,000 <br />$ 1,525,000 <br />$ <br />290,000 <br />$ <br />481,000 <br />Improvement Segment C-2 Segment E <br />Roadway <br />$ <br />67,000 <br />$ <br />223,000 <br />Trails/Sidewalks <br />$ <br />30,000 <br />$ <br />98,000 <br />Street Lighting <br />$ <br />7,000 <br />$ <br />22,000 <br />Storm Sewer <br />$ <br />17,000 <br />$ <br />119,000 <br />Trunk Storm Sewer <br />$ <br />0 <br />$ <br />0 <br />Watermain <br />$ <br />38,000 <br />$ <br />127,000 <br />Sanitary Sewer <br />$ <br />31,000 <br />$ <br />27,000 <br />Trunk San Sewer <br />$ <br />0 <br />$ <br />0 <br />Total Costs <br />$ <br />190,000 <br />$ <br />616,000 <br />Prepared by: Bolton & Menk, Inc. COST ALLOCATION ALTERNATIVES <br />Center Street Area Analysis I R16.114929 Page 9 <br />