Laserfiche WebLink
Segments D-1, D-2, D-3 and D-4 include trails, sidewalks and miscellaneous street scape improvements <br />along Sunwood Drive. The Segments, and associated costs, are presented in the following table. <br />Segment <br />Location <br />Estimated Cost <br />D-1 <br />Zeolite Street to Yolite Street <br />$ <br />204,000 <br />D-2 <br />Yolite Street to Xenolith Street <br />$ <br />198,000 <br />D-3 <br />Xenolith Street to Center Street <br />$ <br />176,000 <br />D-4 <br />Center Street to Sapphire Street <br />$ <br />113,000 <br />Total <br />$ <br />691,000 <br />The above costs are considered project costs and include 30% contingencies and project development <br />costs. Project development costs include administrative, engineering, and fiscal related costs. <br />Summary of Costs <br />The total for the roadway, trail, sidewalk, street lighting, lateral sanitary sewer and water main <br />improvements is estimated at $3,690,000. <br />The total trunk related improvements for sanitary sewer and storm sewer is estimated at $215,000. <br />The total landscaping improvements along Sunwood Drive from Zeolite Street to Sapphire Lane is <br />estimated at $691,000. <br />General Cost EstimatingAssumptions <br />• Dewatering will be required for sewer and water installation. <br />• Fill will be required for all roadways. <br />• Borrow material cost does not assume use of regional pond excavation. <br />• Aggregate base cost does not assume use of City stockpile. <br />Segment A-1 Assumptions <br />• Removal of existing 42-inch storm sewer included in trunk storm sewer cost. <br />• Sanitary sewer is assumed to extend to midpoint of last parcels serviced by sewer line. <br />• Roadway costs include tapering the roadway from a 47 ft wide median to a 20 ft wide median. <br />• Includes an allotment for (2) 6 ft wide sidewalks along the roadway boulevard areas. <br />• Costs for the median include restoration and plantings. <br />Segment A-2 Assumptions <br />• Relocation of 18-inch trunk sanitary sewer into future Ramsey Parkway alignment included in <br />trunk sanitary sewer cost. <br />• Sanitary sewer is assumed to extend to midpoint of last parcels serviced by sewer line. <br />Segment E Assumptions <br />• 30-inch regional pond outlet pipe included in storm sewer cost. <br />• Extension of sanitary sewer laterals to the right of way included in sanitary sewer cost. <br />Additional Assumptions <br />• No costs associated with construction of individual storm water ponds are included, as it is <br />anticipated the regional pond will address all storm water runoff requirements. The regional pond <br />Prepared by: Bolton & Menk, Inc. COST ALLOCATION ALTERNATIVES <br />Center Street Area Analysis I R16.114929 Page 10 <br />