My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/27/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 03/27/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:47:25 PM
Creation date
3/28/2018 12:18:45 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/27/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
838
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The estimated project cost based on final plans and specifications is $662,900.88. <br />The City's 5-year Street Reconstruction and Overlay Program includes the streets listed above as proposed 2018 <br />overlay improvements, allowing the City to utilize street reconstruction bonds to fund the improvements up front. <br />The City's current 10-year Capital Improvement Plan (CIP) includes the proposed 2018 overlay improvements. <br />Copies of each are attached for reference. <br />Special assessments are proposed to fund 25% of eligible project costs, which excludes bituminous patching costs. <br />This amount totals $157,465.92. Proposed special assessment amounts vary by project area. To be consistent with <br />past practice, special assessments are proposed to be equal across all properties in each project area since each <br />property generally receives the same benefit based on similar property values. This is consistent with the "per lot" <br />method of assessment defined within the City's Special Assessments Policy. Final assessment amounts may be <br />more or less based on final construction costs. <br />Storm water funds will fund all storm sewer project costs, which total $27,930. <br />Street reconstruction bonds will ultimately fund all remaining project costs in the estimated amount of $477,504.96, <br />which includes bituminous patching costs. <br />Recommendation: <br />Staff recommends approval of Alternative # 1 for the following reasons: <br />• The bituminous patching work was not identified in the Feasibility Report, nor was it addressed at the Public <br />Hearing. <br />• Assessing 25% of the bituminous patching costs would significantly increase assessments in two of the <br />project areas. <br />• Staff believes the areas of severely damaged pavement correlate to areas of poor subgrade soils. <br />• Subgrade soil corrections are ineligible project costs for street reconstruction projects per the City's adopted <br />Special Assessments Policy. <br />Action: <br />Motion to adopt Resolution #18-057 approving plans and specifications and authorizing advertisements for bids for <br />2018 Street Overlay Improvements, Improvement Project #18-03, and to approve of the City paying for all <br />bituminous patching costs. <br />Resolution 18-057 <br />IP 18-03 Plans <br />Plan Sheet 20 PatchHL <br />Plan Sheet 21 PatchHL <br />Plan Sheet 22 PatchHL <br />2015-2019 SROP <br />IP 18-03 CIP Sheet <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Kurt Ulrich Kurt Ulrich 03/22/2018 02:42 PM <br />Form Started By: Bruce Westby Started On: 03/12/2018 01:12 PM <br />Final Approval Date: 03/22/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.