My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 01/11/2018
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2018
>
Agenda - Parks and Recreation Commission - 01/11/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:44:05 PM
Creation date
5/3/2018 10:42:25 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
01/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Greenway Trail Alternative Alignments <br />6.0 Plan GreenwayTrail Opportunity <br />(Jacobson/LHB 2015) <br />District Stormwater <br />System: <br />+ Clean <br />+ Store <br />+ Reuse <br />Roof & Surface <br />-Water <br />Trail, bridge, <br />boardwalk <br />Private <br />Property <br />Alternative: South GreenwayTrail <br />Alignment (Jacobson/LHB 2015) <br />Pond, wetland, <br />stream channel <br />Public Property Private <br />or Property <br />Permanent Recreation, <br />Drainage, Utility Easement <br />Ramsey Town Center Master <br />Plan (CLOSE, 2001) <br />Greenway Trail Connection <br />Basic assumptions that support Estimate of Potential Construction Costs: <br />• Total acres/square footage for COR Greenway Connection (approx.): 2.5 acres / 108,900 square feet <br />Estimate based on park elements illustrated on Concept Studies: <br />1. excavation/grading 2,000'L x 30'w x 10'd x $3/cubic yard <br />2. concrete combined trail (10') 20,000 square feet x $5/square foot <br />3. rest stops along trail including pavement, bench, canopy (4) <br />4. pedestrian/bike bridges across stormwater features (4) <br />5. lighting 20 pedestrian scale fixtures x $5,000 each <br />6. signage including large monument, information, direction <br />7. miscellaneous utilities/infrastructure <br />8. plantings 100,000 square feet x $5/square foot <br />9. stormwater (surface / below ground), utilities, infrastructure* <br />Subtotal <br />Contingency and Soft Costs <br />$ 100,000 <br />$ 100,000 <br />$ 120,000 <br />$ 200,000 <br />$ 100,000 <br />$ 50,000 <br />$ 50,000 <br />$ 500,000 <br />$ 300,000 <br />$ 1,520,000 <br />$ 366,000 <br />TOTAL $ 1,886,000 <br />or $17.30 per square foot <br />*District systems approach vs. site by site. <br />Public Realm Framework + Cost Evaluation 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.