Laserfiche WebLink
Funding Scenarios and <br />Strategies <br />in <br />cena o 1 - Proximity to Parks; Revenue Producing Factors <br />This Scenario is based on a series of studies conducted by the Trust for Public Land (TPL), and more specifically their 2011 study <br />for the City of Seattle (see attached). Similar calculations for The COR might <br />offer several strategies to capture revenue specifically allocated for park and <br />trail improvements. <br />• Value of properties within 500 feet of parks <br />• Value attributable to parks (4.84%) <br />• Property tax revenue from properties within 500 feet of parks <br />• Tax revenue attributable to parks (4.84%) <br />Strategies: <br />1. Capture a portion of increased property value — park and trail fees <br />calculated as a percentage of property values attributed to nearby parks <br />(adjusted premium per acre land sale cost) <br />2. Capture a portion of increased tax revenue — park and trail <br />improvements calculated as a percentage of tax revenue attributed to nearby <br />parks (then defined within the Parks' CIP) <br />Scenario 2 - District Stormwater Management System; Shared Costs for <br />Infrastructure <br />This Scenario is based on recent work with the Mississippi River Watershed Management Organization to design and implement a <br />district stormwater management system for the Prospect North redevelopment project in Minneapolis. Through additional research/ <br />design provided by Barr Engineering (and other sources) overall project objectives and design parameters were defined that would <br />yield savings (and produce better overall outcomes) for both the City and property owners/developers. This approach used the <br />following baseline assumptions: <br />To meet city standards for stormwater management through a traditional <br />site -by -site approach, property owners/developers would typically spend <br />between $90,000 — 150,000 per impervious acre to be treated. <br />To meet city standards for stormwater management through a district/ <br />shared system approach, costs will typically range from $50,000 — 90,000 per <br />impervious acre to be treated (depending on the level of detail/intensity of <br />the final design). <br />A couple things to note: The ranges shown above include both engineering/ <br />design fees and final construction costs. Ultimately this demonstrated <br />multiple benefits and project efficiencies that meet functional (permitting) <br />requirements and yield significant cost savings using the district/shared <br />system approach, while at the same time raising the bar in terms of aesthetics, <br />habitat creation, recreational use, increased property values and other positive <br />outcomes. <br />Strategies: <br />1. Secure commitments from potential/future property owners/ <br />developers to pay to the City, no more than they typically would for site <br />stormwater management components (site -by -site), but discounted per <br />the savings realized for participating in a district stormwater management <br />approach. For example: agreeing to pay $75,000 per impervious acre instead <br />12 The COR Parks + Public Places -'ty of Ramsey <br />