Laserfiche WebLink
BMP Summary Sheet <br />MS4 Name: City of Ramsey <br />Minimum Control Measure: 4-CONSTRUCTION SITE STORMWATER RUNOFF <br />CONTROL <br />Unique BMP Identification Number: 4e-1 <br />*BMP Title: Establishment of Procedures for the Receipt and Consideration of Reports of Stormwater <br />Noncompliance <br />*BMP Description: <br />The current system of erosion control notices addresses Stormwater Noncompliance. A Stormwater Hotline and <br />website will be added to provide additional avenues for reporting stormwater violations. Currently, calls received <br />on violations are routed to field staff for observation of the condition and preparation of a notice as necessary. <br />Location(s) in SWPPP of detailed information relating to this BMP: <br />*Measurable Goals: <br />Record all calls received including corrective measures performed. <br />Record all notices issued for stormwater noncompliance. <br />*Timeline/Implementation Schedule: <br />December 2006 — Implement Hotline and Website. <br />Ongoing - Observe construction sites and issue notices as needed; receive and follow-up on calls and web postings <br />regarding stormwater noncompliance. <br />Specific Components and Notes: <br />*Responsible Party for this BMP: <br />Name: Leonard Linton <br />Department: Engineering <br />Phone: 763 427-1410 <br />E-mail: llinton(d,ci.ramsev.mn.us <br />*Indicates a REQUIRED field. Failure to complete any required field will result in rejection of the application due <br />to incompleteness. <br />Ramsey Minnesota SWPPP -40- May 2006 February 2009 <br />