Laserfiche WebLink
Final Plat <br />- Drainage and Utility Easements are required around the perimeter of the lot per City Code. <br />CSG RESPONSE: Direction needed — with build to line requirements there is not enough room <br />to add 10' easements along the streets or 5' easement along the east property line. <br />- Plans show a drainage and utility easement for proposed watermain <br />CSG RESPONSE: We have discussed with Leonard Linton and would like to record the <br />waterline easement by separate instrument after installation in case there are any field <br />modifications. Note added to proposed easement on sheet C4.0 "waterline easement to be <br />recorded after installation prior to acceptance" <br />Sheet CO.0 <br />- Public Streets need plan and profile sheets with alignments. Sanitary sewer and watermain shall be <br />the primary focus on one set of sheets with storm sewer in a lighter pen for reference. <br />Storm sewer and street layout shall be the primary focus on the other set of sheets with sanitary sewer <br />and watermain in a lighter pen for reference. <br />Horizontal and vertical curves must be shown and labeled. <br />Refer the the City engineering standards for guidance. <br />CSG RESPONSE: To be completed after street and utility alignments are approved in this <br />submittal. <br />- Show proposed alignment for future parkway and de- emphasize existing ROW lines. <br />CSG RESPONSE: Coversheet modified, no future alignment was provided by the city. <br />Sheet C1.0 <br />- This sheet shows removing storm sewer. The utility plans shows connecting new pipes to this storm <br />sewer. Installation of new pipe is not shown in plans. Revised plan set to address this inconsistency. <br />CSG RESPONSE: Plan has been updated to show complete removal of existing storm system. <br />- Label length of curb to be removed. Saw cut curb full depth at next nearest joint. Bituminous repair at <br />curb removal per city details STR-25 <br />CSG RESPONSE: Sheet C1.0 revised. Detail added to sheet C5.3 <br />- Remove both ped ramps patch bituminous pavement at curb removal per city detail STR-25 <br />CSG RESPONSE: Sheet C1.0 revised. Detail added to sheet C5.3 <br />- Legend not complete there are symbols and line types not shows D <br />CSG RESPONSE: Line types not shown are simply lines in the survey changed to bold to <br />emphasize removal. We do not include every single line type for removal as they are shown on <br />the complete legend on sheet CO.0. The legend on sheet C1.0 shows only our removal lay -over <br />linetypes. We see this sheet to be explanatory enough as is. <br />- Show Removal of Pavement for watermain connection / lowering <br />CSG RESPONSE: Sheet C1.0 revised accordingly <br />- Tree Removal and Tree Protection symbols are included in the legend but not in the plans. Add them <br />to the plans. <br />4931 West 35th Street • Suite 200 • St. Louis Park • Minnesota 55416 www.civilsitegroup.com <br />Matt Pavek, PE • 763-213-3944 Patrick Sarver, PLA 952-250-2003 <br />