My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/12/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 06/12/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:53:07 PM
Creation date
7/27/2018 8:51:02 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/12/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOLTON <br />& MENK <br />Real People. Real Solutions. <br />July 27, 2017 <br />Mr. Bruce Westby, P.E. <br />City Engineer <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, Minnesota 55303 <br />RE: Proposal for Engineering Services <br />Bunker Lake Boulevard and Puma Street Improvement Project <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />Ph: [7631433-2851 <br />Fax: 17631427-0833 <br />Bolton-Menk.com <br />Dear Mr. Westby: <br />We appreciate the opportunity to present this scope of services for the Bunker Lake Boulevard and Puma <br />Street Improvement project. Our scope and fees were prepared based on our understanding of the project <br />and our previous experience in delivering State Aid projects. <br />SCOPE <br />The improvements will be generally as described in our December 3, 2015 report for the Future Business <br />Park. The phasing will be as generally described in our March 2017 Update Report. The improvements <br />will consist of the following items as presented in the above reports and depicted on the attached figure: <br />• Bunker Lake Boulevard construction will begin at the easterly limits of Phase 1A, with pavement <br />and striping tapers to the east. <br />• Bunker Lake Boulevard sanitary sewer and watermain trunk utilities are not included in this <br />scope, as they are being completed by the City under a separate contract. <br />• Puma Street construction will include the Phase 1B area only, with a taper transition north of <br />Phase 1B. <br />• No trail will be constructed along the east side of Puma Street at this time, avoiding the need for <br />right of way acquisition from parcels along the east side of the roadway. <br />• Puma Street utility construction will include extending sanitary sewer and watermain from <br />Bunker Lake Boulevard to the northerly Phase 1B limits. A sanitary sewer lift station will be <br />installed at the low area of Puma Street. <br />• The Bunker Lake Boulevard and Puma Street intersection will most likely be constructed as a Tee <br />intersection, with the third leg being an access to the property to the west. <br />• A site plan is being developed for the property west of Puma Street. We have assumed we will <br />receive AutoCAD files of the site plan for incorporation into our design. <br />Construction costs associated with the improvements described above are estimated at approximately <br />$2,500,000, which includes a 10 percent contingency. <br />Bolton & Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.