My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/12/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 06/12/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:53:07 PM
Creation date
7/27/2018 8:51:02 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/12/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bruce Westby, P.E. <br />July 27, 2017 <br />Page 2 of 2 <br />CONSTRUCTION SEQUENCE <br />To facilitate construction of the public utilities in 2017, the project will be split into two bid packages. <br />Generally, the first bid package will include: <br />• Construction of trunk water main and sanitary sewer along Puma Street, <br />• Construction of the sanitary sewer lift station, and <br />• Temporary gravel resurfacing of Puma Street. <br />This bid package will be prepared, bid, awarded and constructed in 2017. <br />The second bid package will include roadway improvements. The preliminary design will be completed <br />along with the first bid package to ensure the utilities are constructed to match future roadway grades. The <br />remaining design, permitting, and State Aid approvals will then occur through the winter of 2017/2018. <br />Bidding and award will occur early 2018, followed by construction in the spring and summer <br />SCHEDULE <br />We understand the importance of delivering this project to allow for public utility construction to be <br />completed in the fall of 2017. Our understanding of the proposed schedule is as follows: <br />Task Date <br />City Council Action (Authorize Plans) <br />Authorization to Begin Surveying and Design Services <br />Design of Bid Package 1 Complete <br />City Council Approves Plans and Orders Bids — Bid Package 1 <br />Public Bid Opening — Bid Package 1 <br />City Council Accepts Bids / Awards Contracts — Bid Package 1 <br />Begin Construction — Bid Package 1 <br />Substantial Completion — Bid Package 1 <br />City Council Approves Plans and Orders Bids — Bid Package 2 <br />Public Bid Opening — Bid Package 2 <br />City Council Accepts Bids / Awards Contracts — Bid Package 2 <br />Begin Construction — Bid Package 2 <br />Substantial Completion — Bid Package 2 <br />Final Completion — All Bid Packages <br />PERMITTING AND APPROVALS <br />Bid Package 1 work will require permits as follows: <br />• Minnesota Department of Health (Water Main Installation) <br />• Minnesota Pollution Control Agency (Sanitary Sewer Extension) <br />• MPCA (NPDES — Construction Stormwater General Permit) <br />July 25, 2017 <br />July 26, 2017 <br />September 7, 2017 <br />September 12, 2017 <br />October 6, 2017 <br />October 10, 2017 <br />October 23, 2017 <br />December 14, 2017 <br />January 23, 2018 <br />February 20, 2018 <br />February 27, 2018 <br />May 14, 2018 <br />June 29, 2018 <br />July 27, 2018 <br />Bo[ton & Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.