My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/12/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 06/12/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:53:07 PM
Creation date
7/27/2018 8:51:02 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/12/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOLTON <br />& MENK <br />Fee Proposal <br />CLIENT: City of Ramsey <br />PROJECT: Bunker Lake Boulevard and Puma Street <br />BOLTON & MENK, INC. <br />WORK TASK DESCRIPTION <br />Average Hourly Rate <br />V <br />N <br />N M <br />(0 <br />o C <br />a` `0 <br />$168 <br />o C <br />'E 40 <br />vi 0 <br />$136 <br />$115 <br />V N <br />- C <br />1—c <br />w <br />$150 <br />$120 <br />O <br />G1 <br />7 <br />H <br />$130 <br />(0 <br />u <br />V <br />$70 <br />Total <br />Hours <br />Cost <br />Topographical Surveys <br />0.1 <br />Topographical Surveys (Roadway) <br />1 <br />2 <br />2 J 0 <br />20 <br />40 <br />1 <br />66 <br />$8,340 <br />0.2 <br />Topographical Surveys (Public Utilities) <br />1 <br />2 <br />2 0 <br />20 <br />40 <br />1 <br />66 <br />$8,340 <br />TOTAL Preliminary Surveys <br />1 <br />2 <br />2 0 <br />20 <br />40 <br />1 <br />66 <br />$16,680 <br />Bid Package 1 <br />1.1 Preliminary Roadway Design <br />16 <br />40 <br />16 <br />8 0 0 2 82 <br />$11,308 <br />1.2 Preliminary Stormwater Design and Analysis <br />2 <br />4 <br />8 <br />0 4 0 2 20 <br />$2,420 <br />1.3 Trunk Utility Design (Sanitary Sewer and Water) <br />24 <br />60 <br />24 <br />0 20 0 6 134 <br />$17,772 <br />1.4 Sanitary Sewer Lift Station and Forcemain <br />8 <br />32 <br />40 <br />0 40 0 8 128 <br />$15,656 <br />1.5 Permitting <br />2 <br />20 <br />12 <br />0 4 0 12 50 <br />$5,756 <br />1.6 Bidding Services <br />4 <br />16 <br />8 <br />0 0 0 8 36 <br />$4,328 <br />1.7 Construction Staking <br />4 <br />8 <br />8 <br />0 16 40 8 84 <br />$10,360 <br />TOTAL Bid Package 1- Bolton & Menk <br />60 <br />180 <br />116 <br />8 84 40 46 534 <br />$67,600 <br />subLUNJuL I ANT - Northern Technologies <br />$4,000 <br />SUBCONSULTANT - Northern Technologies $4,000 <br />SUBCONSULTANT - Barr Engineering $12,500 <br />TOTAL for Bid Package 1 <br />$88,100 <br />B <br />id Package 2 <br />2.1 Final Roadway Design <br />2.2 Storm Water Management and Design <br />2.3 Street Lighting <br />2.4 Reviews and Approvals <br />2.5 Permitting <br />2.6 Bidding Services <br />2.7 Construction Staking <br />30 <br />8 <br />0 <br />4 <br />2 <br />4 <br />12 <br />TOTAL for Bid Package 2 <br />60 <br />136 <br />32 <br />0 <br />20 <br />20 <br />16 <br />8 <br />204 <br />80 <br />0 <br />12 <br />12 <br />8 <br />16 <br />32 0 <br />O 8 <br />O 0 <br />O 16 <br />O 4 <br />O 0 <br />O 32 <br />O 4 406 <br />O 8 136 <br />O 0 0 <br />O 8 60 <br />O 12 50 <br />O 8 36 <br />200 16 284 <br />232 <br />332 <br />32 <br />60 <br />200 5 <br />972 <br />$52,076 <br />$16,416 <br />$0 <br />$7,252 <br />$5,756 <br />$4,328 <br />$35,904 <br />$121,732 <br />TOTAL FEES - ALL BID PACKAGES - SURVEYING, DESIGN, CONSTRUCTION STAKING <br />$226,512 <br />Represents Roadway Related Costs <br />Represents Utility Related Costs <br />
The URL can be used to link to this page
Your browser does not support the video tag.