Laserfiche WebLink
Deck with 1/4 x 31/2 GRK Structural Screws- Climetek Finish, or approved equal. <br />In any event of a discrepancy within these specifications, or an instance of an <br />omission in details, the existing boardwalk depicted at the beginning of this <br />document (within the City of Ramsey), shall be consulted for guidance in the <br />interpretation of materials, or methods of construction. <br />4. Construction Methods: <br />All material shall be well manufactured. All lumber shall be straight, well sawn, <br />sawed square at ends, and opposite surfaces parallel unless otherwise specified <br />(E.g. 22 degree corners). Workmanship shall be first class throughout. All <br />screws shall be properly set to ensure the heads are flush or slightly recessed with <br />the surface of the wood decking. Proper pre -drilling of holes for screws (as may <br />be necessary) shall be performed to avoid splitting the lumber. <br />All construction is intended to be from the West, at Variolite Street and progress <br />East to the project termini. <br />5. Basis of Payment: <br />Payment for the boardwalk shall be made based upon the lineal foot, as <br />measured with the Owner upon completion; and include all costs associated <br />with fabrication, construction/installation and include material delivery, <br />mobilization, with any other costs considered incidental. <br />CITY SPECIAL PROVISIONS <br />1. General <br />These Special Provisions contain items of specific instruction and subject matter <br />concerning construction detail and/ or are modifications to the General Conditions and <br />Standard Specifications. The Contractor shall conduct his/her work in conformance with <br />the specifications set forth herein and in accordance with the Minnesota Department of <br />Transportation Standard Specifications for Construction (as may be applicable), 2016 <br />Edition, which is incorporated by reference to these specifications. <br />