My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 08/09/2018
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2018
>
Agenda - Parks and Recreation Commission - 08/09/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:45:20 PM
Creation date
8/6/2018 1:46:09 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
08/09/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Project Schedule <br />The City of Ramsey anticipates, but does not guarantee award of this project, on February <br />12t11, 2018. Construction is foreseen to commence on or about February 26t11, 2018. <br />3. Working Hours <br />The work shall be carried out during normal daylight working hours in accordance with <br />local ordinance and so as not to cause any unreasonable nuisance to affected residents. <br />Under emergency conditions, this limitation may be waived in writing by the Owner. <br />Normal working hours in the City of Ramsey are considered to be from 7:00 a.m. to 10:00 <br />p.m. on Monday through Saturday. The contractor shall provide 72 hour advance notice <br />before working on Saturday. City Council approval is required for Sunday work. <br />4. Maintenance of Traffic <br />All traffic control devices if required, shall conform and be installed in accordance to: <br />• The "Minnesota Manual on Uniform Traffic Control <br />MUTCD); <br />• Part 6, "Field Manual for Temporary Traffic Control Zone <br />Manual); <br />• The Speed Limits in Work Zones Guideline; <br />• The Minnesota Flagging Handbook; <br />• The Minnesota Standard Signs Manual; <br />• The Traffic Engineering Manual; <br />The Contractor shall submit the proposed traffic control layout, to the Owner for <br />approval at least five (5) days prior to the start of construction. The Contractor shall <br />modify his/her proposed traffic control layout and/or devices as deemed necessary by <br />the Owner. <br />Devices" (MN <br />Layouts" (Field <br />The Contractor shall notify the local Police and Fire Departments prior to commencing <br />construction that will restrict traffic on any City street to the degree that emergency traffic <br />could not be immediately facilitated. The Contractor shall provide necessary signs, <br />flashers and barricades for any parking or driving lane closures. All signing shall <br />conform to the MnDOT Manual of Uniform Traffic Control Devices. All plans for lane <br />closures shall be submitted to the Owner for approval prior to any closures. <br />
The URL can be used to link to this page
Your browser does not support the video tag.