My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/08/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 02/08/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:40:16 PM
Creation date
2/7/2005 7:58:24 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/08/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
436
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
made about the basic systems furniture. Staff will be bringing options and costs to the Council <br />throughout the process. She explained this product is purchased off of the state bid contract. It <br />would be her recommendation not to go t~ough a huge bidding process for furniture, because the <br />price received will not be much better than through the state contract, which is 70 percent off of <br />retail. Her intent would be to determine :an analysis of the furniture in house and what makes <br />sense. She explained there could be logiS~tical issues involved with moving the furniture to the <br />new City Hall. She explained the plan is not to completely outfit the building, only to provide <br />what is needed upon the move. <br /> <br />Ms. Badinger indicated the estimate provided for furnishings included some new furniture and <br />reusing some of the existing furniture. <br /> <br />Councilmember Cook suggested the Public Works Department, which is being enlarged, may be <br />able to utilize the furniture. <br /> <br />Ms. Badinger reviewed the design develoPment estimate for the Ramsey Municipal Center with <br />the Council in the areas of technology, contingency, and financing costs. She indicated that the <br />adjusted design development project budget tOtal at this time is at $16,316,659, which is $70,230 <br />over budget. She requested direction from the Council regarding the following possible <br />additions to the design: <br /> <br />BuiM Out o_f the Detention Area <br />Police Chief Way explained this is not a jail and the City will not be holding prisoners for any <br />length of time. This detention area would enable the Police Department to conduct interviews on <br />site. It would eliminate a lot oftraveiing to Lino Lakes for interviews and evidence. <br /> <br />Assistant City Administrator Nelson explained the detention area has been designed so that in the <br />future it could be reconfigured to a holding:area. <br /> <br />Mayor Gamec commented the detention area is important just from the time that would be saved. <br /> <br />Councilmember Pearson stated he was jgst t° a joint law enforcement meeting, and in his <br />opinion this is something the City needs. :The concern of all the county officers was the time <br />spent traveling people back and forth. He thinks this detention area would pay for itself. <br /> <br />The consensus of the COuncil was to include the build out of the detention area as a base bid, as <br />well as a deduct alternate. <br /> <br />Perimeter Fence East &: South of Police Parking <br />Ted Redmond of BKV Group reviewed with the Council the options of a four foot high wrought <br />iron steel fence, a six foot high wrought iron steel fence and a four foot high low dry stack stone <br />wall. After discussion, the Council reduced the options to a four foot high wrought iron steel <br />fence and a four foot high low dry stack stone .wall. The Council discussed the maintenance <br />issues, such as snow plowing that would beiassociated with the fence. <br /> <br />City CoUncil WOrkSession/February 1, 2005 <br /> Page 3 of 10 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.