ESTIMATED COSTS <br /> <br />A detailed itemization of project costs is Presented in Appendix C. These costs have <br />been aggregated into the foUr separate categories. Sanitary Sewer and Watermain <br />Service Extension costs include those.costS associated-with the extension of sanitary <br />utilities in order to provide service to properties currently without them. These costs <br />include the removal of existing pavement and the restoration of the class 5 and <br />bituminous base Course through:the p0rti°n of the project which would be disturbed by <br />the installation of these utilitieS. Watermain loOping costs include the northerly extension <br />of the waterrnain a distance of 650 feet frm-n the watermain service extension area <br />through its comlection to the existingmain on Riverdale Drive. This watennain looping <br />includes the costs associated with pavement removal and restoration caused by its <br />installation similar to the sewer and Watermain service benefited area. <br /> <br />FINANCING <br /> <br />This project anticipates utilizinga number of financing sources. The cost of the sanitary <br />sewer and lateral watermain which will provide service to those lots which do not <br />currently have these sanitary services available will be assessed the total cost identified as <br />Sanitary Sewer and Watermain ServiCe Extension identified in Appendix C. These. <br />costs include the removal of the existing pavement and the replacement of the bituminous <br />base course through the southerly 400 feet of Ebony Street. It is proposed that these costs <br />be distributed anlong the benefited prOperties based upon front footagel The looping of <br />the watennain to Riverdale Drive provides the benefit of increased flexibility to the entire <br />water distribution system. These costs are identified as Watermain - Looping in <br />Appendix C. It is proposed that these costs Would be funded by the City utility trunk <br />fund. <br /> <br />The remaining costs associated with, this project include narrowing the roadway, adding <br />concrete curb and gutter, and placing a one and one half inch bituminous wear course <br />over the street. [t iS proposed that 50% of the cost of these improvements be assessed <br />based upon front ~'0otage to the benefihng property owners, and that the remaining 50% <br />be financed by the City General ['und. This is consistent with the policy used in making <br />assessment tot' the mmual street maintenance program. 'A summary of the project costs is <br />presented below: ,. <br /> <br />Funding Source- <br /> <br />Lateral Watermain Street Total <br />Sewer & Water Looping Improvements Project <br /> <br />Special Assessments $ 48,960 $. $ 24,199 $ 73,159 <br />Sewer & Water Trunk <br />Funds $ $ 33,113 $ , - $ 33,113 <br />City General Funds $ $ $ 24,199 $ 24,199 <br />TOTAL $ 48,960 $ 33,113 $ 48,39-7 $ 130,470 <br /> <br />3 <br /> <br /> <br />