My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/08/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 02/08/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:40:16 PM
Creation date
2/7/2005 7:58:24 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/08/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
436
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSED IMPROVEMENTS <br /> <br />This project anticipates the extension of an eight inch sanitary sewer ~iorth along the <br />centerline of Ebony Street a distance of 400 feet. This extension will provi, de sewer <br />availability to the following properties: <br /> · Parcel D (2 lateral stulss) <br /> · Parcel E (1 additional stub) ~ . <br /> · Parcel H(1 stub) <br /> · Parcel G (2 stubs for multifamity) .. <br /> <br />Sewer will not be extended further north: down Ebony Street as a part of this project, <br />since the parcel to the north are presently d~veloped and have existing sewer service. In <br />addition an eiglxt inch watermain will be connected the entire length of Ebony Street <br />between t37~1~ Avenue and Riverdale Drive, a distance of l l00 feet. One inch water <br />service stubs will be provided at each of the above sanitary sewer service locations with <br />the exception of Parcel G Which Shall be provided with a suitable sized service to <br />accommodate the multifamily unit 15roposed.(This parcel is currently zoned Commercial <br />and would need to be rezoned to accommodate the owners desired land use). <br /> <br />The portion of the street throu~ which sanitary sewer is to be extended is anticipated to <br />impact nearly tl~e entire roadway. Consequently the street in this section will be <br />reconstructed 32 feet wide with a pavement section consisting of four inches of class 5 <br />base, two inches of bituminous base' course and 1.5 inches of bituminous wear course. <br />Only one half of the pavement will be removed through the northerly segment of the <br />roadway where tl~e eight inch wate~ ~rmain is to be extended. Through this section of the <br />roadway the west half will be reconstructed to the above specifications while the east half <br />will receive a 1.5 inch bituminous overlay over the remaining pavement. <br /> <br />Concrete curb and gutter wii1 be installed on both curblines. The width of the street Will <br />be reduced from 318 feet to 32 feeh and since there is ex!sting s~otTn sewer framing down <br />the western curbline and the east curb:line move six feet westward and the west curbline <br />remain in its existing location. This adjustment will result in the relocation of the <br />centerline of the street three feet wesL <br /> <br />No changes to the existing stoy-m Sewer System are proposed. However, if the project <br />proceeds the condition of the existing StOrm sewer structures will be inspected. <br />Deteriorated structures will be repaired or replaced with funding from the City's storm <br />water utility. <br /> <br />All disturbed turfed areas will be replaced with four inches of topsoil and sod. Any <br />disturbed driveways shall be neatly sawCut and replaced with like materials and cross <br />sections. <br /> <br />2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.