My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/08/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 02/08/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:40:16 PM
Creation date
2/7/2005 7:58:24 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/08/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
436
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COSTS <br /> <br />intersections of Bunker Lake Boulevard (C.R. 116) with Armstrong Boulevard (C. S.A.H. 83) ar <br />Ramsey Boulevard (C.R. 56),-along with all county highways and intersections between Bunkex <br />LakeiBoulevard andHighway 10; inclusive of Armstrong Boulevard and Ramsey Boulevard. <br />Adequate storage and drainage sYSte~ms wilt be.provided by the City for the ultimate section of <br />each Of those rOadwaYs listed above.in their final configuration as anticipated by this Agreemen~ <br /> <br /> The contract cost of the work, or if the work is not contracted the cost of all labor, materials, <br /> normal engineering Costs, equipment rental .required ~o do the work and right-of-way acquisition <br /> costs Shall constitute ~the actual %onstmcfion costs" and shall be soreferred to herein. Total· <br /> Construction COsts shall include construction costs and administrative costs such as bonding <br /> expenses, legal expert, scs md engineering fees, provided however, that said administrative costs <br /> shall not exceed126 percent (26%) of the construction costs. "Estimated total construction costs' <br /> are good faith projections 0feosts which will be incurred for the projects. <br />Total estimated ConStmcfi°n cost of the Improvements described in schedules A, B and C is <br />$13,050,372.08.! TheSe figures are based on the City estimates included in the "Summary of. <br />Estimated Proje~t CoSts for~ the Ramsey Town Center Improvements" incorporated herein by <br />reference. The project costs Shall be paid for by special assessmen.ts, City funds, State funds, <br />Federal funds and Cotmty e°nthbUfions, as hereinafter provided. The projects for wh/ch the cost <br />are to be shared bY the County andthe City, the estimated total cost of each project, and the <br />County participation in each projeot ia listed in schedules "A", "B", and "C" on Pages 9 and <br />this ~greement. <br /> <br />The estimated costs for the iqgnal projects are $2,801,250 of which $t,012,500 is on.T.H. 10. <br />The remaining $1,788;750.in estimated signal costs are on County highways. Since only two of <br />the signal systems on ~he COunty highway system are warranted, the County will not participate <br />in theiv;constnlcfi°n of Unwarranted signals. The county will participate in construction of and <br />will pr&vide ongoing malntcnanee for the-signal systems'at Armstrong Boulevard (CSAH 83) at <br />Bunker:Lake Boulevard (C.R. 116) and Ramsey BOulevard (CSAH/CR 57) at Bunker Lake <br />Boulevard (CSAH 116i, in acCordance wifh the county cost sharing policy. <br />( 1 ) The City 81mll ~ubmit plans for each signal system,, including EVP, to the County for <br /> review and approva! sixty (.60) days prior to the advertising for bids. The City Shall pay <br /> to the CoUnty a planreview fee of $1,000 for eack signal plan submitted. <br /> <br />7 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.