My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 08/02/2018
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2018
>
Agenda - Planning Commission - 08/02/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:31:31 AM
Creation date
8/30/2018 3:58:34 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
08/02/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
can be accommodated with a shared left turn/through lane and dedicated <br />right turn lane. <br />iii. 129th Avenue/Pineview Lane — Three phase signal with dedicated turn <br />lanes on the 129th Avenue approaches. <br />Although not necessary for capacity reasons, additional dedicated turn lanes <br />beyond those detailed here may be required or desired. <br />The above mitigation recommendations provide sufficient traffic flow and LOS for <br />the projected 2040 volumes. Due to the extended forecast of these volumes, and <br />the amount of variability in city growth and development that may occur, the 2040 <br />mitigation should not be implemented in the short term. However, purchasing of <br />sufficient right-of-way to install the mitigation when need is recommended. <br />A figure in the Appendix shows the recommended intersection mitigation. <br />Traffic Impact Study 26 <br />North Dayton Development <br />CONSULTING <br />
The URL can be used to link to this page
Your browser does not support the video tag.