My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 08/02/2018
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2018
>
Agenda - Planning Commission - 08/02/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:31:31 AM
Creation date
8/30/2018 3:58:34 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
08/02/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
potential issues due to general background growth and other specific development <br />traffic with or without the proposed North Dayton site: <br />• Continue to work on long-term solutions with other agencies to accommodate <br />future congestion on the TH 169 and CSAH 81 corridors. <br />• Construct a multi -lane roundabout at the Dayton River Road/South Diamond <br />Lake Road intersection, with two-lane Dayton River Road approaches. A traffic <br />signal with dedicated turn lanes could also provide the necessary capacity at the <br />intersection, although a roundabout is preferred due to improved safety and <br />better off-peak operations. <br />• Construct single -lane roundabouts at the intersections of 129th <br />Avenue/Pineview Lane, Dayton River Road/Brockton Lane, and South Diamond <br />Lake Road/Pineview Lane. Traffic signals with dedicated turn lanes could also <br />provide the necessary capacity at the intersection, although roundabouts are <br />preferred due to improved safety and better off-peak operations. <br />• Continue to update signal timing at all signalized intersections at least every <br />three to five years. <br />With the North Dayton proposed development traffic contributing to the study area <br />volumes, the following additional 2040 mitigation is recommended: <br />• Provide dedicated right turn lanes for the Dayton River Road/Pineview Lane <br />intersection single -lane roundabout using the reserved right-of-way if a <br />roundabout was constructed as part of the 2025 mitigation. <br />• Construct a single -lane roundabout at the N Diamond Lake Road/Zanzibar Lane <br />intersection. A traffic signal with dedicated turn lanes could also provide the <br />necessary capacity at the intersection, although a roundabout is preferred due <br />to improved safety and better off-peak operations. <br />• Construct multi -lane roundabout at the Dayton River Road/N Diamond Lake <br />Road intersection, with two-lane Dayton River Road approaches. A traffic signal <br />with dedicated turn lanes could also provide the necessary capacity at the <br />intersection, although a roundabout is preferred due to improved safety and <br />better off-peak operations. <br />• Provide dedicated right turn lanes for the N Diamond Lake Road/Brockton Lane <br />intersection single -lane roundabout using the reserved right-of-way if a <br />roundabout was constructed as part of the 2025 mitigation. <br />As before, for intersections where a roundabout or a traffic signal is proposed, a detail <br />Intersection Control Evaluation will be necessary. This document will evaluate the two <br />control options and document the decision for which option is ultimately constructed. <br />For the purposed of this document, roundabouts are the preferred option. <br />In addition to these roadway improvements, the following items are also recommended <br />based upon the traffic analysis for the proposed development: <br />• Reserve space, if necessary, for the future trail network in this area as planned <br />by the City of Dayton. <br />Traffic Impact Study 29 <br />North Dayton Development <br />=CONSULTING <br />
The URL can be used to link to this page
Your browser does not support the video tag.