My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 08/02/2018
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2018
>
Agenda - Planning Commission - 08/02/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:31:31 AM
Creation date
8/30/2018 3:58:34 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
08/02/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix D - Trip Generation Tables <br />CONSULTING <br />ENGINEERING TRAFFIC FORWARD <br />Weekday Daily Volumes <br />Table D3A <br />2025 Additional NE Developments <br />LAND USE <br />ITE <br />CODE # <br />DEVELOPMENT <br />UNITS <br />QUANTITY <br />DAILY <br />RATE <br />ENTER <br />PERCENT <br />EXIT <br />PERCENT <br />NEW TRIPS <br />ENTER <br />EXIT <br />Single Family <br />AM Peak Volumes <br />LAND USE <br />Single Family <br />PM Peak Volumes <br />LAND USE <br />Single Family <br />210 <br />Units <br />Total <br />391.0 <br />9.44 <br />50% <br />50% <br />ITE <br />CODE # <br />DEVELOPMENT <br />UNITS <br />QUANTITY <br />PEAK <br />RATE <br />ENTER <br />PERCENT <br />EXIT <br />PERCENT <br />1,846 <br />1,846 <br />1,846 <br />1,846 <br />NEW TRIPS <br />ENTER <br />210 Units 391.0 0.74 25% 75% 72 <br />Total 72 <br />ITE DEVELOPMENT QUANTITY PEAK ENTER EXIT <br />CODE # UNITS RATE PERCENT PERCENT <br />EXIT <br />217 <br />217 <br />NEW TRIPS <br />ENTER <br />210 Units 391.0 0.99 63% 37% 244 <br />Total 244 <br />NOTES: <br />1. All trip generation rates based on "Trip Generation", Institute of Transportation Engineers, 9th Edition <br />unless otherwise noted. <br />2. A.M. Trip Generation is for the peak hour of adjacent street traffic (one hour between 7 and 9 a.m.). <br />3. P.M. Trip Generation is for the peak hour of adjacent street traffic (one hour between 4 and 6 p.m.). <br />CONSULTING <br />. GINEERING TRAFFIC FORWARD <br />Weekday Daily Volumes <br />LAND USE <br />Single Family <br />AM Peak Volumes <br />ITE <br />CODE # <br />DEVELOPMENT <br />UNITS <br />EXIT <br />143 <br />143 <br />Table D3B <br />2025 Additional Adjacent Developments <br />QUANTITY <br />210 Units 423.0 <br />Total <br />DAILY <br />RATE <br />9.44 <br />ENTER <br />PERCENT <br />EXIT <br />PERCENT <br />NEW TRIPS <br />50% <br />50% <br />ENTER <br />1,997 <br />1,997 <br />EXIT <br />1,997 <br />1,997 <br />LAND USE <br />ITE <br />CODE # <br />DEVELOPMENT <br />UNITS <br />QUANTITY <br />PEAK <br />RATE <br />ENTER <br />PERCENT <br />EXIT <br />PERCENT <br />NEW TRIPS <br />ENTER <br />EXIT <br />Single Family <br />PM Peak Volumes <br />LAND USE <br />Single Family <br />210 <br />ITE <br />CODE # <br />Units <br />Total <br />DEVELOPMENT <br />UNITS <br />423.0 <br />0.74 <br />25% <br />75% <br />78 <br />78 <br />235 <br />235 <br />QUANTITY <br />210 Units 423.0 <br />Total <br />PEAK <br />RATE <br />0.99 <br />ENTER <br />PERCENT <br />EXIT <br />PERCENT <br />NEW TRIPS <br />63% <br />37% <br />NOTES: <br />1. All trip generation rates based on "Trip Generation", Institute of Transportation Engineers, 9th Edition <br />unless otherwise noted. <br />2. A.M. Trip Generation is for the peak hour of adjacent street traffic (one hour between 7 and 9 a.m.). <br />3. P.M. Trip Generation is for the peak hour of adjacent street traffic (one hour between 4 and 6 p.m.). <br />ENTER <br />264 <br />264 <br />EXIT <br />155 <br />155 <br />North Dayton Development D3 <br />Spack Consulting <br />
The URL can be used to link to this page
Your browser does not support the video tag.