Laserfiche WebLink
Proj CtDOXY <br />Current Project - Project Markups Listing <br />File Name <br />Markup Name <br />Markup Text <br />Markup Date <br />Created by <br />4 Site.pdf <br />4 Site.pdf <br />LL <br />Calculations must demonstrate that taking storm <br />water from County Right of Way will not overload <br />existing system down stream of this site. <br />The complete ROW drainage area must be <br />mapped and included in the submittal. <br />LL Final plans <br />90 degree bends must be replaced with two 45 <br />degree bends. <br />06/25/2018 <br />Len <br />Linton <br />06/25/2018 Len <br />Linton <br />All bends and fittings must be labeled. <br />4 Site.pdf LL Additional watermain valves shall be added per 06/25/2018 Len <br />Utility Department directoin to provide for efficient Linton <br />flushing of the water system. <br />All watermain and sanitary sewer shall be in a <br />drainage and utility easement <br />5 Grade.pdf LL See note on sheet 4. 06/25/2018 Len <br />Linton <br />5 Grade.pdf LL Final plans require spot elevations at all lot 06/25/2018 Len <br />corners. Linton <br />Minimum grade on site shall be 2% on non paved <br />surfaces. <br />5 Grade.pdf LL Work in the County ROW will require a permit. 06/25/2018 Len <br />Provide copy of permit at pre -construction Linton <br />conference. <br />5 Grade.pdf JJF 06/22/2018 Joe <br />Feriancek <br />5 Grade.pdf JJF The minimum grade is 2%. 06/22/2018 Joe <br />As shown this will infiltrate water, no infiltration is Feriancek <br />allowed on -site. <br />4 Site.pdf JJF 06/22/2018 Joe <br />Feriancek <br />