My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/11/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 09/11/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:55:39 PM
Creation date
9/11/2018 8:42:29 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/11/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proj CtDOXY <br />Current Project - Project Markups Listing <br />File Name <br />Markup Name <br />Markup Text <br />Markup Date <br />Created by <br />4 Site.pdf <br />4 Site.pdf <br />4 Site.pdf JJF Consider adding visitor parking stalls on south end 06/22/2018 Joe <br />of Olivine Terrace (into Outlot C). This would have Feriancek <br />the added benefit of allowing vehicle to turn <br />around, in addition to the extra parking. <br />4 Site.pdf JJF 06/22/2018 Joe <br />Feriancek <br />JJF As shown this setup will infiltrate water, no <br />infiltration is allowed on -site. <br />Recommend replaing rain-gardian with Catch <br />Basin and connecting to storm sewer. <br />JJ F <br />06/22/2018 <br />Joe <br />Feriancek <br />06/22/2018 Joe <br />Feriancek <br />4 Site.pdf JJF Add valve north of TEE. 06/22/2018 Joe <br />Feriancek <br />2 EXCON.pdf Chloe McGuire Please add total site acreage. 05/25/2018 Chloe <br />McGuire Brigl <br />4 Site.pdf Chloe McGuire 05/25/2018 Chloe <br />McGuire Brigl <br />4 Site.pdf Chloe McGuire Build to lines along Bunker and Ramsey are 30 05/25/2018 Chloe <br />feet. You can build to 20, but are allowed 30. McGuire Brigl <br />4 Site.pdf Chloe McGuire 05/25/2018 Chloe <br />McGuire Brigl <br />4 Site.pdf Chloe McGuire Build to line along Ramsey is 30 feet - you can 05/25/2018 Chloe <br />build to 20 but are allowed up to 30. McGuire Brigl <br />4 Site.pdf Chloe If removing infiltration basin per engineering 05/25/2018 Chloe <br />comments, show trail connection from Ramsey to McGuire Brigl <br />Olivine through this area. <br />4 Site.pdf LL No Infiltration permitted on site. Developer must 05/22/2018 Len <br />contribute to Infiltration Mitigation Fund Linton <br />administered by City. <br />4 Site.pdf LL Submit calculation supporting picking up drainage 05/22/2018 Len <br />from County Highway Ditch. Linton <br />4 Site.pdf LL Plan and profile sheets will be required for all 05/22/2018 Len <br />utilities in the Final Plat submittal. Linton <br />5 Grade.pdf LL No Infiltration on site. See note on Utility plan for 05/22/2018 Len <br />more information. Linton <br />
The URL can be used to link to this page
Your browser does not support the video tag.