My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 09/06/2018
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2018
>
Agenda - Planning Commission - 09/06/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:31:37 AM
Creation date
9/14/2018 3:57:17 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
09/06/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
360
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review File: 18-130: Bunker Lake Industrial Park Second Addition Final Plat and Site Plan Review <br />Page 3 of 3 <br />Landscaping. Please refer to the landscaping review memo dated August 28, 2018. <br />Topsoil. Each individual lot shall have four (4) inches of topsoil meeting the City's topsoil specification applied to all <br />disturbed areas not improved with impervious surfacing. It is strongly encouraged to limit land disturbance on each lot to <br />limit the quantity of topsoil required. A topsoil inspection is required prior to landscaping being installed and copies of the load <br />tickets are required as well. This is reviewed at time of Building Permit Application and request for Certificate of Occupancy <br />for each individual lot. <br />Lighting. Plans show Cobra -style street lighting and downcast lighting attached to the proposed building. This style of downcast <br />lighting is consistent with zoning. <br />Building Elevations. Color building elevations have been requested as additional information. Generally speaking, the black <br />and white elevations provided as part of the current submittal appear to meeting zoning district requirements. <br />Parking/loading areas. Per the city code, one parking stall is required for every 300 square feet of office space or one parking <br />stall per 1,000 square feet of industrial space. The site plan shows a 60,800 square foot building with 125 parking stalls, six (6) <br />of which are shown as handicapped stalls. 100% industrial uses would require a total of 60 spaces whereas 100% office use <br />would require a total of 203 parking spaces. The 125 proposed spaces is more than is required for industrial but less than for <br />office. Staff anticipates a mixture of office/warehouse space and as such it is Staffs opinion that the proposed number of <br />parking spaces is sufficient. <br />Septic/Drainfield. The current plan proposes connection to city utility services as such, no septic systems or drainfields are <br />proposed. <br />Trash Enclosure. Exterior trash enclosure to be constructed of 8" rockface concrete block to match principal structure. Block <br />will be capped with a metal cap. Doors of enclosure are proposed to be vertical composite wood siding over tube steel door <br />frames. <br />Other comments. None. <br />Recommendation. City Staff is recommending that the City Council approve the Final Plat for the Bunker Lake Industrial <br />Park Addition as well as Site Plan approval, with the considerations listed in this staff report, contingent upon review and <br />approval of the civil engineering plan by the City Engineer. <br />Next Steps. The developer will be required to enter into a Development Agreement with the City to ensure the timely <br />construction of required improvements. The Development Agreement will also require a financial surety in the amount of 125% <br />of the cost of required improvements. The financial surety shall be in the form of a Letter of Credit or cash escrow only. The <br />Development Agreement will also require an Engineering Inspection Fee of 5% of the cost of required improvements. The <br />escrow must be in the form of a cash escrow. The City will prepare a draft Development Agreement for your review once an <br />engineer's estimate has been provided by the Applicant. <br />
The URL can be used to link to this page
Your browser does not support the video tag.