Laserfiche WebLink
85 <br />Table 8: Transportation Implementation Strategies <br />Type of Improvement Action Map Reference Lead Agency(ies) <br />CR 63/TH Corridor Study Conduct a multimodal Figure 12 Anoka County/ <br />47/179th safety/operations corridor study to City of Ramsey <br />Avenue NW (CR evaluate potential elimination of <br />27 from CSAH 83 intersection jog at Green Valley <br />to Roanoke Road NW/County Road 5/175th <br />Street NW Avenue NW. Also evaluate overall <br />safety operations along entire <br />corridor to evaluate speed, <br />shoulder adequacy, signing, <br />bicycling and pedestrian safety, <br />traffic enforcement etc. <br />East/West Corridor Study Conduct a multimodal corridor Figure 12 City of Ramsey <br />Collector feasibility study to evaluate <br />between CR 63 purpose and need and potential <br />(Green Valley alignment alternatives for a new <br />Road) and east/west collector roadway <br />Bunker Lake connecting Armstrong Boulevard <br />Boulevard (CSAH 83) to TH 47. <br />(CSAH 116) <br />Mississippi River River Crossing Study Conduct a feasibility study to Figure 12 City of Ramsey/ <br />Crossing evaluate purpose and need and City of Dayton/ <br />potential alignment alternatives for Anoka County/ <br />a new Mississippi River crossing Hennepin County <br />connecting the City of Ramsey to <br />the City of Dayton <br />Bunker Lake Corridor Study Conduct a mulfimodal corridor Figure 12 Anoka County/ <br />Boulevard study to evaluate safety, City of Ramsey <br />(CSAH 116) and operafions, and capacity <br />Puma Street NW deficiencies. As part of this study, <br />from Alpine the segment between Ramsey <br />Drive to CSAH 7 Boulevard (CSAH 56) and Sunfish <br />Lake Boulevard (CSAH 57) should <br />specifically be considered for a <br />four -lane divided expansion and <br />signals at Sunwood Drive NW <br />Armstrong Corridor Study Conduct a mulfimodal corridor Figure 12 Anoka County/ <br />Boulevard study to evaluate safety, City of Ramsey <br />(CSAH 83) from operafions, and capacity <br />Sunwood Drive deficiencies. As part of this study, a <br />to 161 st Avenue four-way stop or other intersection <br />NW control options should be <br />considered at Alpine Drive and <br />updates/enhancements to the <br />pedestrian crossing and associated <br />signage will be considered at 161 st <br />Avenue NW. <br />TH 47 from north Corridor Study Conduct a mulfimodal corridor Figure 12 MnDOT/ <br />city limits to south study to evaluate safety, City of Ramsey <br />city limits operafions, and capacity <br />deficiencies. <br />r <br />city of RAMSEY <br />August 2018 Draft <br />Comprehensive Plan 2040 <br />