Laserfiche WebLink
84 <br />5. Develop a safe and <br />convenient multimodal <br />transportation system <br />6. Conserve and <br />enhance environmental <br />resources <br />7. Maintain the Existing <br />Transportation System <br />4.3. Bring sidewalks, trails, and intersections into compliance with <br />ADA. <br />4.4. Support traffic calming and design to minimize speed on minor <br />city collectors and local roadways. <br />5.1. Invest in multi -modal transportation solutions including bicycle <br />and pedestrian infrastructure. <br />5.2 Consider a "complete streets" approach to designing and <br />constructing roadways in high pedestrian and bicycle traffic <br />corridors. <br />5.2. Preserve adequate right of way for sidewalk and trail <br />construction. <br />6.1. Support investments in bicycle, pedestrian, and transit <br />infrastructure to reduce environmental impacts of transportation. <br />6.2. Manage storm water effectively and minimize the construction of <br />new impervious surfaces. <br />6.3. Support native plant landscapes along roadways. <br />6.4. Design new roadways to preserve natural features. <br />7.1. Regularly assess transportation maintenance needs and include <br />roadway, trail pavement, and other transportation infrastructure <br />maintenance in the City of Ramsey Capital Improvement Program. <br />Multimodal Strategies <br />The multimodal strategies listed in this section are specific, actionable steps that the city can take in <br />support of the goals of this Plan. These strategies are based upon existing and future transportation <br />needs as described in detail in the previous sections of this Plan. <br />Each strategy is tied to one or multiple goals; however, not all goals are associated with a specific <br />strategy. In these cases, the city's goals apply across individual projects, and the city will identify <br />opportunities to achieve them throughout its existing project and policy development processes. <br />Table 8 on the following pages describes each strategy, notes which goal(s) is/are related to each <br />strategy, and identifies the lead agency for the strategy. Figures 12-14 following the tables <br />illustrate the location -specific strategies geographically. <br />city of RAMSEY <br />August 2018 Draft <br />Comprehensive Plan 2040 <br />